IAC Assessment: KU0280
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0280
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1989
Principal Product INJECTION MOLDED PLASTIC
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 9,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,409 5,448,124 kWh $0.04
Natural Gas $10,075 2,636 MMBtu $3.82
TOTAL ENERGY COSTS $231,484
RECOMMENDED SAVINGS* $8,177 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,215
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,621
Cost:
$500
$3,621 89,097 - - $3,621
89,097
kWh
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,382
Cost:
-
$2,382 58,617 - - $2,382
58,617
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,048
Cost:
$2,032
$1,048 25,791 - - $1,048
25,791
kWh
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$440
Cost:
$100
- - $440 115 -
-
kWh
$440
115
MMBtu
05: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$250
Cost:
-
$250 6,155 - - $250
6,155
kWh
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$293
Cost:
$560
$488 12,016 $(-195) (-51) $488
12,016
kWh
$(-195)
(-51)
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$143
Cost:
$40
$143 3,517 - - $143
3,517
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,177
Cost:
$3,232
$7,932 195,193 $245 64 $7,932
195,193
kWh
$245
64
MMBtu
TOTAL IMPLEMENTED Savings:
$3,215
Cost:
$140
$2,775 68,289 $440 115 $2,775
68,289
kWh
$440
115
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas