IAC Assessment: KU0290
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0290
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1989
Principal Product PHARMACEUTICALS
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 380
Plant Area (Sq.Ft.) 0
Annual Production 863,000 Pieces
Production Hrs. Annual 6,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $486,798 14,225,674 kWh $0.03
Natural Gas $82,957 35,687 MMBtu $2.32
TOTAL ENERGY COSTS $569,755
RECOMMENDED SAVINGS* $57,883 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,435
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,044
Cost:
$2,360
$4,044 118,406 - - - - $4,044
118,406
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,341
Cost:
$2,800
$1,341 39,273 - - - - $1,341
39,273
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,211
Cost:
-
$1,211 35,463 - - - - $1,211
35,463
kWh
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,337
Cost:
$4,000
$10,330 302,462 $(-2,993) (-1,290) - - $10,330
302,462
kWh
$(-2,993)
(-1,290)
MMBtu
-
-
$
05: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING Savings:
$20,380
Cost:
$12,500
$20,380 596,717 - - - - $20,380
596,717
kWh
-
-
MMBtu
-
-
$
06: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$4,390
Cost:
-
- - - - $4,390 - -
-
kWh
-
-
MMBtu
$4,390
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$16,667
Cost:
-
$16,667 - - - - - $16,667
-
kWh
-
-
MMBtu
-
-
$
08: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$2,513
Cost:
$4,000
$2,513 73,564 - - - - $2,513
73,564
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$57,883
Cost:
$25,660
$56,486 1,165,885 $(-2,993) (-1,290) $4,390 - $56,486
1,165,885
kWh
$(-2,993)
(-1,290)
MMBtu
$4,390
-
$
TOTAL IMPLEMENTED Savings:
$24,435
Cost:
$6,360
$24,435 227,433 - - - - $24,435
227,433
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes