IAC logo
IAC Assessment: KU0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1989
Principal Product EXTRUDED RUBBER HOSE
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 205
Plant Area (Sq.Ft.) 0
Annual Production 12,200,000 Pounds
Production Hrs. Annual 6,912
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $500,081 12,113,130 kWh $0.04
Natural Gas $149,272 43,608 MMBtu $3.42
TOTAL ENERGY COSTS $649,353
RECOMMENDED SAVINGS* $30,915 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,366
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$218
Cost:
$119
$218 5,275 - - - - $218
5,275
kWh
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,367
Cost:
-
- - $2,767 809 $(-400) - -
-
kWh
$2,767
809
MMBtu
$(-400)
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,843
Cost:
$3,200
- - $1,843 539 - - -
-
kWh
$1,843
539
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$339
Cost:
$1,200
$339 8,206 - - - - $339
8,206
kWh
-
-
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,688
Cost:
$13,500
$7,688 - - - - - $7,688
-
kWh
-
-
MMBtu
-
-
$
06: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$15,540
Cost:
$9,000
- - - - $15,540 - -
-
kWh
-
-
MMBtu
$15,540
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,339
Cost:
$7,000
- - $2,257 660 $82 - -
-
kWh
$2,257
660
MMBtu
$82
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$581
Cost:
$350
- - $581 170 - - -
-
kWh
$581
170
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$30,915
Cost:
$34,369
$8,245 13,481 $7,448 2,178 $15,222 - $8,245
13,481
kWh
$7,448
2,178
MMBtu
$15,222
-
$
TOTAL IMPLEMENTED Savings:
$24,366
Cost:
$24,169
$8,245 13,481 $581 170 $15,540 - $8,245
13,481
kWh
$581
170
MMBtu
$15,540
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes