IAC logo
IAC Assessment: KU0316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1990
Principal Product FLUIDS FOR AUTO INDUSTRY
NAICS n/a
SIC 2992 - Lubricating Oils And Greases
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 20,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $216,092 4,340,856 kWh $0.05
Natural Gas $25,705 6,494 MMBtu $3.96
TOTAL ENERGY COSTS $241,797
RECOMMENDED SAVINGS* $19,834 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,727
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,487
Cost:
$2,075
$3,487 70,047 - - - - $3,487
70,047
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$924
Cost:
$1,005
$924 18,464 - - - - $924
18,464
kWh
-
-
MMBtu
-
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$7,122
Cost:
$15,000
$7,362 148,007 - - $(-240) - $7,362
148,007
kWh
-
-
MMBtu
$(-240)
-
$
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$4,990
Cost:
$7,200
$4,990 100,234 - - - - $4,990
100,234
kWh
-
-
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,160
Cost:
$2,250
$2,160 - - - - - $2,160
-
kWh
-
-
MMBtu
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,034
Cost:
$1,000
- - $1,034 261 - - -
-
kWh
$1,034
261
MMBtu
-
-
$
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$117
Cost:
-
$117 2,345 - - - - $117
2,345
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,834
Cost:
$28,530
$19,040 339,097 $1,034 261 $(-240) - $19,040
339,097
kWh
$1,034
261
MMBtu
$(-240)
-
$
TOTAL IMPLEMENTED Savings:
$14,727
Cost:
$21,330
$13,933 236,518 $1,034 261 $(-240) - $13,933
236,518
kWh
$1,034
261
MMBtu
$(-240)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes