IAC logo
IAC Assessment: KU0319
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0319
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1990
Principal Product TRUCK BED EQUIPMENT
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 0
Annual Production 5,000 Pieces
Production Hrs. Annual 6,864
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,889 1,759,965 kWh $0.07
Natural Gas $55,553 14,824 MMBtu $3.75
TOTAL ENERGY COSTS $180,442
RECOMMENDED SAVINGS* $11,579 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,895
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,684
Cost:
$2,597
$1,684 23,740 - - - - $1,684
23,740
kWh
-
-
MMBtu
-
-
$
02: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$6,698
Cost:
$1,200
$1,268 17,878 $5,430 1,448 - - $1,268
17,878
kWh
$5,430
1,448
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$604
Cost:
$400
$270 3,810 $334 89 - - $270
3,810
kWh
$334
89
MMBtu
-
-
$
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$168
Cost:
$400
$104 1,465 $64 17 - - $104
1,465
kWh
$64
17
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$468
Cost:
$360
$372 5,275 - - $96 - $372
5,275
kWh
-
-
MMBtu
$96
-
$
06: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$832
Cost:
$487
$832 11,723 - - - - $832
11,723
kWh
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,125
Cost:
-
- - $1,125 300 - - -
-
kWh
$1,125
300
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,579
Cost:
$5,444
$4,530 63,891 $6,953 1,854 $96 - $4,530
63,891
kWh
$6,953
1,854
MMBtu
$96
-
$
TOTAL IMPLEMENTED Savings:
$9,895
Cost:
$2,847
$2,846 40,151 $6,953 1,854 $96 - $2,846
40,151
kWh
$6,953
1,854
MMBtu
$96
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes