IAC Assessment: KU0345
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0345
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1991
Principal Product GYPSUM
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 0
Plant Area (Sq.Ft.) 0
Annual Production 1,190 Thousand Feet
Production Hrs. Annual 6,120
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,725 788,980 kWh $0.06
Natural Gas $18,670 5,071 MMBtu $3.68
TOTAL ENERGY COSTS $62,395
RECOMMENDED SAVINGS* $88,883 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,515
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$71,400
Cost:
-
- - - - $71,400 - -
-
kWh
-
-
MMBtu
$71,400
-
$
02: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$3,220
Cost:
$1,500
- - $3,220 875 - - -
-
kWh
$3,220
875
MMBtu
-
-
$
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,154
Cost:
$2,200
- - $3,154 857 - - -
-
kWh
$3,154
857
MMBtu
-
-
$
04: 2.7314 REDUCE VENTILATION AIR Savings:
$1,505
Cost:
$200
$504 9,086 $1,001 272 - - $504
9,086
kWh
$1,001
272
MMBtu
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$374
Cost:
$600
$374 6,741 - - - - $374
6,741
kWh
-
-
MMBtu
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,461
Cost:
$5,300
$3,461 62,427 - - - - $3,461
62,427
kWh
-
-
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$618
Cost:
$950
- - $618 168 - - -
-
kWh
$618
168
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$715
Cost:
$300
$715 12,896 - - - - $715
12,896
kWh
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$536
Cost:
$60
$536 9,672 - - - - $536
9,672
kWh
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,528
Cost:
$1,000
$1,528 27,550 - - - - $1,528
27,550
kWh
-
-
MMBtu
-
-
$
11: 2.6232 INSTALL SET-BACK TIMERS Savings:
$796
Cost:
$950
$796 14,361 - - - - $796
14,361
kWh
-
-
MMBtu
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$169
Cost:
-
$276 4,982 - - $(-107) - $276
4,982
kWh
-
-
MMBtu
$(-107)
-
$
13: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$439
Cost:
$1,429
$439 7,913 - - - - $439
7,913
kWh
-
-
MMBtu
-
-
$
14: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$968
Cost:
-
- - - - $968 - -
-
kWh
-
-
MMBtu
$968
-
$
TOTAL RECOMMENDED Savings:
$88,883
Cost:
$14,489
$8,629 155,628 $7,993 2,172 $72,261 - $8,629
155,628
kWh
$7,993
2,172
MMBtu
$72,261
-
$
TOTAL IMPLEMENTED Savings:
$16,515
Cost:
$14,489
$8,629 155,628 $7,993 2,172 $(-107) - $8,629
155,628
kWh
$7,993
2,172
MMBtu
$(-107)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes