IAC Assessment: KU0349
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0349
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1991
Principal Product BREADS, PASTRIES, DOUGHS
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 15,800,000 Pieces
Production Hrs. Annual 7,176
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,820 2,781,067 kWh $0.04
Natural Gas $54,690 21,396 MMBtu $2.56
TOTAL ENERGY COSTS $165,510
RECOMMENDED SAVINGS* $12,944 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$4,092
Cost:
$5,200
$3,048 76,495 $1,044 408 - - $3,048
76,495
kWh
$1,044
408
MMBtu
-
-
$
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$1,460
Cost:
$2,800
$1,460 36,635 - - - - $1,460
36,635
kWh
-
-
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,110
Cost:
$200
$1,110 27,843 - - - - $1,110
27,843
kWh
-
-
MMBtu
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$934
Cost:
$1,500
$934 23,447 - - - - $934
23,447
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$677
Cost:
$850
$677 16,999 - - - - $677
16,999
kWh
-
-
MMBtu
-
-
$
06: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$1,377
Cost:
-
- - $1,377 538 - - -
-
kWh
$1,377
538
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$413
Cost:
-
- - $1,213 474 $(-800) - -
-
kWh
$1,213
474
MMBtu
$(-800)
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,702
Cost:
$3,024
$1,702 - - - - - $1,702
-
kWh
-
-
MMBtu
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$829
Cost:
$410
$829 20,809 - - - - $829
20,809
kWh
-
-
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$222
Cost:
$380
$222 5,569 - - - - $222
5,569
kWh
-
-
MMBtu
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$128
Cost:
-
$128 3,224 - - - - $128
3,224
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,944
Cost:
$14,364
$10,110 211,021 $3,634 1,420 $(-800) - $10,110
211,021
kWh
$3,634
1,420
MMBtu
$(-800)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes