IAC logo
IAC Assessment: KU0350
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0350
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1991
Principal Product FARM TILLAGE EQUIPMENT
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 215
Plant Area (Sq.Ft.) 0
Annual Production 2,300 Pieces
Production Hrs. Annual 3,856
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $250,684 4,947,538 kWh $0.05
Natural Gas $136,460 106,278 MMBtu $1.28
Other Energy $7,729 1,189 MMBtu $6.50
TOTAL ENERGY COSTS $394,873
RECOMMENDED SAVINGS* $51,019 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,019
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$36,079
Cost:
-
- - $21,725 16,973 $4,634 713 $9,720 - -
-
kWh
$21,725
16,973
MMBtu
$4,634
713
MMBtu
$9,720
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,101
Cost:
$12,000
- - $1,101 860 - - - - -
-
kWh
$1,101
860
MMBtu
-
-
MMBtu
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$6,192
Cost:
$7,440
$6,192 122,216 - - - - - - $6,192
122,216
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$995
Cost:
$550
$995 19,637 - - - - - - $995
19,637
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$550
Cost:
$950
$550 10,844 - - - - - - $550
10,844
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,198
Cost:
$1,230
$5,198 102,579 - - - - - - $5,198
102,579
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$692
Cost:
$450
- - $692 541 - - - - -
-
kWh
$692
541
MMBtu
-
-
MMBtu
-
-
$
08: 2.2514 COVER OPEN TANKS Savings:
$212
Cost:
$350
- - $212 166 - - - - -
-
kWh
$212
166
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$51,019
Cost:
$22,970
$12,935 255,276 $23,730 18,540 $4,634 713 $9,720 - $12,935
255,276
kWh
$23,730
18,540
MMBtu
$4,634
713
MMBtu
$9,720
-
$
TOTAL IMPLEMENTED Savings:
$51,019
Cost:
$22,970
$12,935 255,276 $23,730 18,540 $4,634 713 $9,720 - $12,935
255,276
kWh
$23,730
18,540
MMBtu
$4,634
713
MMBtu
$9,720
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes