IAC logo
IAC Assessment: KU0351
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0351
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1991
Principal Product BRASS PLUMBING
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 0
Annual Production 66,000 Pieces
Production Hrs. Annual 5,253
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,477 1,378,957 kWh $0.05
Natural Gas $8,068 1,924 MMBtu $4.19
TOTAL ENERGY COSTS $80,545
RECOMMENDED SAVINGS* $10,086 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,086
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,020
Cost:
$3,380
$3,080 58,617 $1,940 463 $3,080
58,617
kWh
$1,940
463
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,664
Cost:
$744
$2,664 50,703 - - $2,664
50,703
kWh
-
-
MMBtu
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$693
Cost:
$400
$693 13,189 - - $693
13,189
kWh
-
-
MMBtu
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,047
Cost:
$1,600
$1,093 20,809 $(-46) (-11) $1,093
20,809
kWh
$(-46)
(-11)
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$662
Cost:
-
$662 12,603 - - $662
12,603
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$10,086
Cost:
$6,124
$8,192 155,921 $1,894 452 $8,192
155,921
kWh
$1,894
452
MMBtu
TOTAL IMPLEMENTED Savings:
$10,086
Cost:
$6,124
$8,192 155,921 $1,894 452 $8,192
155,921
kWh
$1,894
452
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas