IAC Assessment: KU0369
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0369
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1992
Principal Product STEEL SERVICE
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 53
Plant Area (Sq.Ft.) 0
Annual Production 1,500,000 Pounds
Production Hrs. Annual 6,048
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,689 766,413 kWh $0.09
Natural Gas $48,820 12,173 MMBtu $4.01
TOTAL ENERGY COSTS $115,509
RECOMMENDED SAVINGS* $32,166 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,637
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$14,242
Cost:
-
- - $14,242 - - - -
-
kWh
$14,242
-
MMBtu
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$10,390
Cost:
$38,850
- - $10,390 2,591 - - -
-
kWh
$10,390
2,591
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,781
Cost:
$430
$1,224 14,068 $557 139 - - $1,224
14,068
kWh
$557
139
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$466
Cost:
$1,769
$466 5,275 - - - - $466
5,275
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$366
Cost:
-
$408 4,689 - - $(-42) - $408
4,689
kWh
-
-
MMBtu
$(-42)
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$918
Cost:
$750
$918 10,551 - - - - $918
10,551
kWh
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,856
Cost:
$125
$2,856 32,825 - - - - $2,856
32,825
kWh
-
-
MMBtu
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,147
Cost:
-
$1,428 16,413 $(-281) (-70) - - $1,428
16,413
kWh
$(-281)
(-70)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,166
Cost:
$41,924
$7,300 83,821 $24,908 2,660 $(-42) - $7,300
83,821
kWh
$24,908
2,660
MMBtu
$(-42)
-
$
TOTAL IMPLEMENTED Savings:
$4,637
Cost:
$555
$4,080 46,893 $557 139 - - $4,080
46,893
kWh
$557
139
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes