Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1993 |
Principal Product | TACOS AND TORTILLAS |
NAICS | n/a |
SIC | 2038 - Frozen Specialties, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 240 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 15,000,000 Pounds |
Production Hrs. Annual | 5,460 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $104,526 | 2,635,991 | kWh | $0.04 |
Natural Gas | $62,163 | 23,965 | MMBtu | $2.59 |
TOTAL ENERGY COSTS | $166,689 | |||
RECOMMENDED SAVINGS* | $33,752 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,129 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Primary Raw Material | Electricity Usage | Natural Gas | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $15,571 Cost: $21,400 |
$(-1,104) | (-27,843) | $16,675 | 6,361 | - | - | - | - |
$(-1,104) (-27,843) kWh |
$16,675 6,361 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1393 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING |
Savings: $6,812 Cost: $6,925 |
- | - | $6,812 | 2,630 | - | - | - | - |
- - kWh |
$6,812 2,630 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $3,811 Cost: $10,000 |
$3,811 | 96,131 | - | - | - | - | - | - |
$3,811 96,131 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,274 Cost: $10,000 |
$4,590 | 115,768 | $(-1,316) | (-508) | - | - | - | - |
$4,590 115,768 kWh |
$(-1,316) (-508) MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,545 Cost: $1,172 |
$2,545 | 34,877 | - | - | - | - | - | - |
$2,545 34,877 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $1,065 Cost: $216 |
- | - | - | - | $130 | - | $935 | - |
- - kWh |
- - MMBtu |
$130 - $ |
$935 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $422 Cost: $668 |
- | - | $422 | 163 | - | - | - | - |
- - kWh |
$422 163 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
Savings: $252 Cost: - |
- | - | $252 | 97 | - | - | - | - |
- - kWh |
$252 97 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $33,752 Cost: $50,381 |
$9,842 | 218,933 | $22,845 | 8,743 | $130 | - | $935 | - | $9,842 218,933 kWh |
$22,845 8,743 MMBtu |
$130 - $ |
$935 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,129 Cost: $7,141 |
- | - | $7,064 | 2,727 | $130 | - | $935 | - | - - kWh |
$7,064 2,727 MMBtu |
$130 - $ |
$935 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Primary Raw Material | Electricity Usage | Natural Gas | Administrative Changes | Primary Raw Material |