Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1993 |
Principal Product | Plating |
NAICS | n/a |
SIC | 3471 - Plating And Polishing |
Sales | $5,000,000-$10,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 2,000,000 Pieces |
Production Hrs. Annual | 8,592 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $225,228 | 5,840,856 | kWh | $0.04 |
Natural Gas | $123,888 | 38,540 | MMBtu | $3.21 |
LPG | $6,051 | 747 | MMBtu | $8.10 |
TOTAL ENERGY COSTS | $355,167 | |||
RECOMMENDED SAVINGS* | $91,475 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,697 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | LPG | Personnel Changes | Electricity Usage | Natural Gas | LPG | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $57,570 Cost: $375,000 |
$162,300 | 4,209,555 | $(-87,546) | (-30,273) | - | - | $(-17,184) | - |
$162,300 4,209,555 kWh |
$(-87,546) (-30,273) MMBtu |
- - MMBtu |
$(-17,184) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2514 COVER OPEN TANKS |
Savings: $17,260 Cost: $11,104 |
- | - | $17,260 | 5,377 | - | - | - | - |
- - kWh |
$17,260 5,377 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $10,681 Cost: $35,000 |
$14,159 | 243,552 | $(-3,478) | (-1,068) | - | - | - | - |
$14,159 243,552 kWh |
$(-3,478) (-1,068) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,229 Cost: $710 |
- | - | $3,229 | 1,006 | - | - | - | - |
- - kWh |
$3,229 1,006 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $294 Cost: $171 |
$294 | 7,620 | - | - | - | - | - | - |
$294 7,620 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $976 Cost: $1,200 |
- | - | $976 | 304 | - | - | - | - |
- - kWh |
$976 304 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $757 Cost: $221 |
$757 | 19,637 | - | - | - | - | - | - |
$757 19,637 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE |
Savings: $527 Cost: $1,000 |
- | - | - | - | $527 | 65 | - | - |
- - kWh |
- - MMBtu |
$527 65 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $181 Cost: $85 |
$181 | 4,689 | - | - | - | - | - | - |
$181 4,689 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $91,475 Cost: $424,491 |
$177,691 | 4,485,053 | $(-69,559) | (-24,654) | $527 | 65 | $(-17,184) | - | $177,691 4,485,053 kWh |
$(-69,559) (-24,654) MMBtu |
$527 65 MMBtu |
$(-17,184) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,697 Cost: $13,491 |
$1,232 | 31,946 | $21,465 | 6,687 | - | - | - | - | $1,232 31,946 kWh |
$21,465 6,687 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | LPG | Personnel Changes | Electricity Usage | Natural Gas | LPG | Personnel Changes |