IAC logo
IAC Assessment: KU0417
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0417
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1993
Principal Product Fiberglass Boats
NAICS n/a
SIC 3732 - Boat Building And Repairing
Sales $50,000,000-$100,000,000
# of Employees 275
Plant Area (Sq.Ft.) 108,000
Annual Production 2,600 Pieces
Production Hrs. Annual 3,250
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,477 2,007,620 kWh $0.07
Natural Gas $66,620 24,033 MMBtu $2.77
TOTAL ENERGY COSTS $198,097
RECOMMENDED SAVINGS* $8,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,592
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,107
Cost:
$24,322
$(-2,610) (-39,859) $7,717 2,786 - - $(-2,610)
(-39,859)
kWh
$7,717
2,786
MMBtu
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,151
Cost:
$1,978
$1,151 17,585 - - - - $1,151
17,585
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$844
Cost:
$3,966
$844 12,896 - - - - $844
12,896
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$198
Cost:
$300
$134 2,052 - - $64 - $134
2,052
kWh
-
-
MMBtu
$64
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$172
Cost:
$192
$77 1,172 - - $95 - $77
1,172
kWh
-
-
MMBtu
$95
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$518
Cost:
$577
$518 7,913 - - - - $518
7,913
kWh
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$230
Cost:
$180
$230 3,517 - - - - $230
3,517
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$8,220
Cost:
$31,515
$344 5,276 $7,717 2,786 $159 - $344
5,276
kWh
$7,717
2,786
MMBtu
$159
-
$
TOTAL IMPLEMENTED Savings:
$1,592
Cost:
$4,723
$1,592 24,326 - - - - $1,592
24,326
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes