IAC Assessment: KU0423
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0423
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1994
Principal Product Radio Controls
NAICS n/a
SIC 3944 - Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 17,320
Annual Production 3,300 Pieces
Production Hrs. Annual 2,125
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,325 179,660 kWh $0.09
Natural Gas $4,562 923 MMBtu $4.94
TOTAL ENERGY COSTS $20,887
RECOMMENDED SAVINGS* $2,796 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,224
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,156
Cost:
$1,663
$799 8,792 - - $357 - $799
8,792
kWh
-
-
MMBtu
$357
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$240
Cost:
$300
$240 2,638 - - - - $240
2,638
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$80
Cost:
$125
$80 879 - - - - $80
879
kWh
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$904
Cost:
$900
- - $904 183 - - -
-
kWh
$904
183
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$229
Cost:
$477
$293 3,224 $(-64) (-13) - - $293
3,224
kWh
$(-64)
(-13)
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$187
Cost:
$135
$187 2,052 - - - - $187
2,052
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$2,796
Cost:
$3,600
$1,599 17,585 $840 170 $357 - $1,599
17,585
kWh
$840
170
MMBtu
$357
-
$
TOTAL IMPLEMENTED Savings:
$1,224
Cost:
$1,325
$320 3,517 $904 183 - - $320
3,517
kWh
$904
183
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes