IAC Assessment: KU0425
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0425
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1994
Principal Product Concrete Finishing Tools
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 108,000
Annual Production 2,500,000 Pieces
Production Hrs. Annual 4,693
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,922 2,105,510 kWh $0.06
Natural Gas $40,215 11,048 MMBtu $3.64
TOTAL ENERGY COSTS $165,137
RECOMMENDED SAVINGS* $22,348 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,081
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$6,707
Cost:
$12,000
$3,721 62,720 $2,986 846 - - - - $3,721
62,720
kWh
$2,986
846
MMBtu
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,145
Cost:
$14,000
$8,312 140,094 $(-2,167) (-614) - - - - $8,312
140,094
kWh
$(-2,167)
(-614)
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,604
Cost:
$2,150
$2,604 43,962 - - - - - - $2,604
43,962
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$643
Cost:
$120
$643 10,844 - - - - - - $643
10,844
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,695
Cost:
$12,025
$4,042 67,995 - - $1,653 - - - $4,042
67,995
kWh
-
-
MMBtu
$1,653
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$241
Cost:
$150
$155 2,638 - - - - $86 - $155
2,638
kWh
-
-
MMBtu
-
-
$
$86
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$313
Cost:
$377
$313 5,275 - - - - - - $313
5,275
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,348
Cost:
$40,822
$19,790 333,528 $819 232 $1,653 - $86 - $19,790
333,528
kWh
$819
232
MMBtu
$1,653
-
$
$86
-
$
TOTAL IMPLEMENTED Savings:
$12,081
Cost:
$26,175
$12,509 210,727 $(-2,167) (-614) $1,653 - $86 - $12,509
210,727
kWh
$(-2,167)
(-614)
MMBtu
$1,653
-
$
$86
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost