IAC logo
IAC Assessment: KU0429
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0429
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1994
Principal Product Buses
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 93,346
Annual Production 1,300 Pieces
Production Hrs. Annual 2,535
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,246 954,279 kWh $0.06
Natural Gas $37,909 16,236 MMBtu $2.33
TOTAL ENERGY COSTS $95,155
RECOMMENDED SAVINGS* $39,188 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,880
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,336
Cost:
$1,050
$1,705 28,429 $2,631 1,129 - - $1,705
28,429
kWh
$2,631
1,129
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,231
Cost:
$37,260
$(-1,406) (-23,447) $8,637 3,707 - - $(-1,406)
(-23,447)
kWh
$8,637
3,707
MMBtu
-
-
$
03: 3.4151 MINIMIZE WATER USAGE Savings:
$11,654
Cost:
$7,175
- - - - $11,654 - -
-
kWh
-
-
MMBtu
$11,654
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$8,263
Cost:
$29,640
$8,263 137,749 - - - - $8,263
137,749
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,920
Cost:
$4,726
$1,920 19,343 - - - - $1,920
19,343
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,580
Cost:
$879
$1,580 17,292 - - - - $1,580
17,292
kWh
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$756
Cost:
$1,550
$756 12,603 - - - - $756
12,603
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$879
Cost:
$1,800
$879 14,068 - - - - $879
14,068
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$756
Cost:
$2,793
$756 12,603 - - - - $756
12,603
kWh
-
-
MMBtu
-
-
$
10: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$721
Cost:
$170
$721 12,016 - - - - $721
12,016
kWh
-
-
MMBtu
-
-
$
11: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$282
Cost:
$1,420
- - $282 121 - - -
-
kWh
$282
121
MMBtu
-
-
$
12: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$440
Cost:
$1,395
$440 7,327 - - - - $440
7,327
kWh
-
-
MMBtu
-
-
$
13: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$370
Cost:
$1,386
- - $370 159 - - -
-
kWh
$370
159
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$39,188
Cost:
$91,244
$15,614 237,983 $11,920 5,116 $11,654 - $15,614
237,983
kWh
$11,920
5,116
MMBtu
$11,654
-
$
TOTAL IMPLEMENTED Savings:
$17,880
Cost:
$18,929
$5,856 75,322 $370 159 $11,654 - $5,856
75,322
kWh
$370
159
MMBtu
$11,654
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes