IAC logo
IAC Assessment: KU0441
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0441
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1994
Principal Product navaids
NAICS n/a
SIC 3812 - Search And Navigation Equipment
Sales $50,000,000-$100,000,000
# of Employees 600
Plant Area (Sq.Ft.) 500,000
Annual Production 150 Pieces
Production Hrs. Annual 2,500
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $658,911 10,662,368 kWh $0.06
Natural Gas $62,220 12,232 MMBtu $5.09
TOTAL ENERGY COSTS $721,131
RECOMMENDED SAVINGS* $99,101 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $88,674
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$58,997
Cost:
$73,718
$58,997 694,607 - - $58,997
694,607
kWh
-
-
MMBtu
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$21,533
Cost:
-
$21,533 348,476 - - $21,533
348,476
kWh
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,081
Cost:
$2,950
$7,081 114,596 - - $7,081
114,596
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,871
Cost:
$2,862
$4,871 34,291 - - $4,871
34,291
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,140
Cost:
$1,369
$2,140 14,361 - - $2,140
14,361
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$290
Cost:
$300
$290 4,689 - - $290
4,689
kWh
-
-
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,698
Cost:
$700
$2,698 43,669 - - $2,698
43,669
kWh
-
-
MMBtu
08: 2.2514 COVER OPEN TANKS Savings:
$916
Cost:
$2,056
- - $916 180 -
-
kWh
$916
180
MMBtu
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$303
Cost:
$510
$303 3,224 - - $303
3,224
kWh
-
-
MMBtu
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$272
Cost:
$150
$272 4,396 - - $272
4,396
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$99,101
Cost:
$84,615
$98,185 1,262,309 $916 180 $98,185
1,262,309
kWh
$916
180
MMBtu
TOTAL IMPLEMENTED Savings:
$88,674
Cost:
$77,940
$88,674 1,128,663 - - $88,674
1,128,663
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas