IAC logo
IAC Assessment: KU0450
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0450
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1995
Principal Product Point of purchase displays
NAICS n/a
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $5,000,000-$10,000,000
# of Employees 350
Plant Area (Sq.Ft.) 303,886
Annual Production 41,000 Thousand Feet
Production Hrs. Annual 6,600
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,404 3,201,641 kWh $0.05
Natural Gas $47,886 9,545 MMBtu $5.02
TOTAL ENERGY COSTS $227,581
RECOMMENDED SAVINGS* $28,825 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,540
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes
$ kWh $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,232
Cost:
$34,320
$9,087 166,764 - - - - $2,145 - $9,087
166,764
kWh
-
-
MMBtu
-
-
Tgal
$2,145
-
$
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,753
Cost:
$420
$3,753 68,875 - - - - - - $3,753
68,875
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,214
Cost:
$1,970
$1,214 22,274 - - - - - - $1,214
22,274
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$391
Cost:
$660
$160 2,931 - - - - $231 - $160
2,931
kWh
-
-
MMBtu
-
-
Tgal
$231
-
$
05: 3.4155 METER WASTE WATER Savings:
$2,463
Cost:
$500
- - - - $2,463 - - - -
-
kWh
-
-
MMBtu
$2,463
-
Tgal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,821
Cost:
$232
$1,821 33,411 - - - - - - $1,821
33,411
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,310
Cost:
$180
$1,310 24,033 - - - - - - $1,310
24,033
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,246
Cost:
$165
$1,246 22,860 - - - - - - $1,246
22,860
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,004
Cost:
$2,184
- - $1,004 200 - - - - -
-
kWh
$1,004
200
MMBtu
-
-
Tgal
-
-
$
10: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$990
Cost:
$3,850
- - - - $990 495,000 - - -
-
kWh
-
-
MMBtu
$990
495,000
Tgal
-
-
$
11: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,417
Cost:
$4,200
$2,417 - - - - - - - $2,417
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
12: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$984
Cost:
$150
- - $984 196 - - - - -
-
kWh
$984
196
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$28,825
Cost:
$48,831
$21,008 341,148 $1,988 396 $3,453 495,000 $2,376 - $21,008
341,148
kWh
$1,988
396
MMBtu
$3,453
495,000
Tgal
$2,376
-
$
TOTAL IMPLEMENTED Savings:
$3,540
Cost:
$495
$2,556 46,893 $984 196 - - - - $2,556
46,893
kWh
$984
196
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes