Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1995 |
Principal Product | water jet cutting systems |
NAICS | n/a |
SIC | 3541 - Machine Tools, Metal Cutting Types |
Sales | $10,000,000-$50,000,000 |
# of Employees | 126 |
Plant Area (Sq.Ft.) | 71,000 |
Annual Production | 88 Pieces |
Production Hrs. Annual | 4,788 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $143,027 | 2,675,557 | kWh | $0.05 |
Natural Gas | $3,551 | 661 | MMBtu | $5.37 |
TOTAL ENERGY COSTS | $146,578 | |||
RECOMMENDED SAVINGS* | $50,232 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $44,607 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $28,987 Cost: $18,760 |
$48,577 | 908,558 | $(-19,590) | (-3,648) | - | - |
$48,577 908,558 kWh |
$(-19,590) (-3,648) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,681 Cost: $10,200 |
$8,681 | 162,368 | - | - | - | - |
$8,681 162,368 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,625 Cost: $8,741 |
$3,244 | 60,668 | - | - | $1,381 | - |
$3,244 60,668 kWh |
- - MMBtu |
$1,381 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,851 Cost: $5,940 |
$2,398 | 44,842 | - | - | $453 | - |
$2,398 44,842 kWh |
- - MMBtu |
$453 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,037 Cost: $1,750 |
$2,037 | 38,101 | - | - | - | - |
$2,037 38,101 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $778 Cost: $1,140 |
$345 | 6,448 | - | - | $433 | - |
$345 6,448 kWh |
- - MMBtu |
$433 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $548 Cost: $120 |
$548 | 10,258 | - | - | - | - |
$548 10,258 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $737 Cost: $333 |
$737 | 13,775 | - | - | - | - |
$737 13,775 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $831 Cost: $865 |
$831 | 15,533 | - | - | - | - |
$831 15,533 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $157 Cost: $176 |
$157 | 2,931 | - | - | - | - |
$157 2,931 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $50,232 Cost: $48,025 |
$67,555 | 1,263,482 | $(-19,590) | (-3,648) | $2,267 | - | $67,555 1,263,482 kWh |
$(-19,590) (-3,648) MMBtu |
$2,267 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $44,607 Cost: $40,002 |
$62,383 | 1,166,764 | $(-19,590) | (-3,648) | $1,814 | - | $62,383 1,166,764 kWh |
$(-19,590) (-3,648) MMBtu |
$1,814 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes |