IAC logo
IAC Assessment: KU0454
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0454
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1995
Principal Product water jet cutting systems
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $10,000,000-$50,000,000
# of Employees 126
Plant Area (Sq.Ft.) 71,000
Annual Production 88 Pieces
Production Hrs. Annual 4,788
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,027 2,675,557 kWh $0.05
Natural Gas $3,551 661 MMBtu $5.37
TOTAL ENERGY COSTS $146,578
RECOMMENDED SAVINGS* $50,232 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,607
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$28,987
Cost:
$18,760
$48,577 908,558 $(-19,590) (-3,648) - - $48,577
908,558
kWh
$(-19,590)
(-3,648)
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,681
Cost:
$10,200
$8,681 162,368 - - - - $8,681
162,368
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,625
Cost:
$8,741
$3,244 60,668 - - $1,381 - $3,244
60,668
kWh
-
-
MMBtu
$1,381
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,851
Cost:
$5,940
$2,398 44,842 - - $453 - $2,398
44,842
kWh
-
-
MMBtu
$453
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,037
Cost:
$1,750
$2,037 38,101 - - - - $2,037
38,101
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$778
Cost:
$1,140
$345 6,448 - - $433 - $345
6,448
kWh
-
-
MMBtu
$433
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$548
Cost:
$120
$548 10,258 - - - - $548
10,258
kWh
-
-
MMBtu
-
-
$
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$737
Cost:
$333
$737 13,775 - - - - $737
13,775
kWh
-
-
MMBtu
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$831
Cost:
$865
$831 15,533 - - - - $831
15,533
kWh
-
-
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$157
Cost:
$176
$157 2,931 - - - - $157
2,931
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$50,232
Cost:
$48,025
$67,555 1,263,482 $(-19,590) (-3,648) $2,267 - $67,555
1,263,482
kWh
$(-19,590)
(-3,648)
MMBtu
$2,267
-
$
TOTAL IMPLEMENTED Savings:
$44,607
Cost:
$40,002
$62,383 1,166,764 $(-19,590) (-3,648) $1,814 - $62,383
1,166,764
kWh
$(-19,590)
(-3,648)
MMBtu
$1,814
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes