Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1995
Principal Product envelopes
NAICS n/a
SIC 2677 - Envelopes
Sales $1,000,000-$5,000,000
# of Employees 54
Plant Area (Sq.Ft.) 56,000
Annual Production 120,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,622 771,688 kWh $0.07
Natural Gas $12,175 2,183 MMBtu $5.58
TOTAL ENERGY COSTS $66,797
RECOMMENDED SAVINGS* $5,997 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,741
Cost:
$751
$2,200 31,067 - - $541 - $2,200
31,067
kWh
-
-
MMBtu
$541
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,604
Cost:
$2,876
$1,245 17,585 - - $359 - $1,245
17,585
kWh
-
-
MMBtu
$359
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$237
Cost:
$300
$237 3,517 - - - - $237
3,517
kWh
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$830
Cost:
$2,950
$830 11,723 - - - - $830
11,723
kWh
-
-
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$257
Cost:
$539
$374 5,275 $(-117) (-21) - - $374
5,275
kWh
$(-117)
(-21)
MMBtu
-
-
$
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$208
Cost:
$55
$208 2,931 - - - - $208
2,931
kWh
-
-
MMBtu
-
-
$
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$120
Cost:
$15
$98 1,465 $22 4 - - $98
1,465
kWh
$22
4
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,997
Cost:
$7,486
$5,192 73,563 $(-95) (-17) $900 - $5,192
73,563
kWh
$(-95)
(-17)
MMBtu
$900
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes