IAC Assessment: KU0458
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0458
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1996
Principal Product screen-printed T-shirts
NAICS n/a
SIC 2396 - Automotive And Apparel Trimmings
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 45,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 2,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,848 832,649 kWh $0.07
Electricity Demand $29,564 4,286 kW-months/year $6.90
Natural Gas $9,236 1,982 MMBtu $4.66
TOTAL ENERGY COSTS $112,004
RECOMMENDED SAVINGS* $96,159 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,791
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$50,368
Cost:
$147,448
$41,102 604,631 $24,364 3,531 $(-15,098) (-3,240) - - $41,102
604,631
kWh
$24,364
3,531
kW-months/year
$(-15,098)
(-3,240)
MMBtu
-
-
lb
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$35,563
Cost:
$2,800
$31,796 467,761 $3,767 546 - - - - $31,796
467,761
kWh
$3,767
546
kW-months/year
-
-
MMBtu
-
-
lb
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$6,111
Cost:
-
- - - - - - $6,111 26,250 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,111
26,250
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,935
Cost:
$4,856
$1,393 20,516 $542 79 - - - - $1,393
20,516
kWh
$542
79
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,402
Cost:
$850
$1,402 20,516 - - - - - - $1,402
20,516
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$780
Cost:
$257
$566 8,206 $214 31 - - - - $566
8,206
kWh
$214
31
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$96,159
Cost:
$156,211
$76,259 1,121,630 $28,887 4,187 $(-15,098) (-3,240) $6,111 26,250 $76,259
1,121,630
kWh
$28,887
4,187
kW-months/year
$(-15,098)
(-3,240)
MMBtu
$6,111
26,250
lb
TOTAL IMPLEMENTED Savings:
$45,791
Cost:
$8,763
$35,157 516,999 $4,523 656 - - $6,111 26,250 $35,157
516,999
kWh
$4,523
656
kW-months/year
-
-
MMBtu
$6,111
26,250
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)