IAC Assessment: KU0471
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0471
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1996
Principal Product gray and ductile iron castings
NAICS n/a
SIC 3792 - Travel Trailers And Campers
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 3,500 Tons
Production Hrs. Annual 6,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,126 961,606 kWh $0.04
Electricity Demand $13,306 336 kW-months/year $39.60
Natural Gas $41,946 10,055 MMBtu $4.17
TOTAL ENERGY COSTS $89,378
RECOMMENDED SAVINGS* $52,238 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,321
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS Savings:
$35,724
Cost:
$13,720
- - - - - - $6,558 - $29,166 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,558
-
$
$29,166
-
$
02: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$11,084
Cost:
$1,500
- - - - - - - - $11,084 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$11,084
-
$
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$1,648
Cost:
$1,000
- - - - $1,648 407 - - - - -
-
kWh
-
-
kW-months/year
$1,648
407
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,101
Cost:
$374
$686 19,637 $415 10 - - - - - - $686
19,637
kWh
$415
10
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$729
Cost:
$1,020
$197 5,569 $26 1 - - $506 - - - $197
5,569
kWh
$26
1
kW-months/year
-
-
MMBtu
$506
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$658
Cost:
$800
$421 12,016 $237 6 - - - - - - $421
12,016
kWh
$237
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$527
Cost:
$446
$327 9,379 $200 5 - - - - - - $327
9,379
kWh
$200
5
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$471
Cost:
$585
$249 7,034 $151 4 - - - - $71 - $249
7,034
kWh
$151
4
kW-months/year
-
-
MMBtu
-
-
$
$71
-
$
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$296
Cost:
$1,155
$487 14,068 $51 1 $(-242) (-60) - - - - $487
14,068
kWh
$51
1
kW-months/year
$(-242)
(-60)
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$52,238
Cost:
$20,600
$2,367 67,703 $1,080 27 $1,406 347 $7,064 - $40,321 - $2,367
67,703
kWh
$1,080
27
kW-months/year
$1,406
347
MMBtu
$7,064
-
$
$40,321
-
$
TOTAL IMPLEMENTED Savings:
$38,321
Cost:
$16,854
$1,619 46,308 $643 16 $(-242) (-60) $7,064 - $29,237 - $1,619
46,308
kWh
$643
16
kW-months/year
$(-242)
(-60)
MMBtu
$7,064
-
$
$29,237
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material