IAC Assessment: KU0472
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0472
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1997
Principal Product railway equipment
NAICS n/a
SIC 3743 - Railroad Equipment
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 92,000
Annual Production 20,000 Pieces
Production Hrs. Annual 4,316
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,498 2,078,546 kWh $0.02
Electricity Demand $33,193 6,096 kW-months/year $5.45
Natural Gas $24,654 5,055 MMBtu $4.88
TOTAL ENERGY COSTS $123,932
RECOMMENDED SAVINGS* $89,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,140
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$920
Cost:
$100
- - - - $920 189 - - - - - - - - -
-
kWh
-
-
kW-months/year
$920
189
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$610
Cost:
$1,730
$340 14,361 $270 48 - - - - - - - - - - $340
14,361
kWh
$270
48
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$540
Cost:
$1,500
$540 23,154 - - - - - - - - - - - - $540
23,154
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$410
Cost:
$310
$220 9,086 $190 35 - - - - - - - - - - $220
9,086
kWh
$190
35
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$320
Cost:
$310
$150 6,155 $90 17 - - - - - - $80 - - - $150
6,155
kWh
$90
17
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$80
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$260
Cost:
$480
$60 2,638 $20 4 - - - - $180 - - - - - $60
2,638
kWh
$20
4
kW-months/year
-
-
MMBtu
-
-
gal
$180
-
$
-
-
$
-
-
$
07: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$4,740
Cost:
$13,000
- - - - - - $4,740 10,395 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,740
10,395
gal
-
-
$
-
-
$
-
-
$
08: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$66,490
Cost:
$21,110
- - - - - - - - - - - - $66,490 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$66,490
-
$
09: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$15,600
Cost:
$9,750
- - - - - - - - $15,600 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$15,600
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$89,890
Cost:
$48,290
$1,310 55,394 $570 104 $920 189 $4,740 10,395 $15,780 - $80 - $66,490 - $1,310
55,394
kWh
$570
104
kW-months/year
$920
189
MMBtu
$4,740
10,395
gal
$15,780
-
$
$80
-
$
$66,490
-
$
TOTAL IMPLEMENTED Savings:
$73,140
Cost:
$35,310
$430 17,879 $300 56 $920 189 $4,740 10,395 $180 - $80 - $66,490 - $430
17,879
kWh
$300
56
kW-months/year
$920
189
MMBtu
$4,740
10,395
gal
$180
-
$
$80
-
$
$66,490
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Primary Product