IAC logo
IAC Assessment: KU0476
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0476
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1997
Principal Product heating elements
NAICS n/a
SIC 3567 - Industrial Furnaces And Ovens
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 44,000
Annual Production 535,000 Pieces
Production Hrs. Annual 4,318
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,702 1,230,070 kWh $0.04
Electricity Demand $27,783 6,708 kW-months/year $4.14
Natural Gas $8,625 1,379 MMBtu $6.25
TOTAL ENERGY COSTS $101,811
RECOMMENDED SAVINGS* $34,080 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,850
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$13,340
Cost:
-
$19,620 497,069 $10,730 2,592 $(-17,010) (-2,898) - - - - - - $19,620
497,069
kWh
$10,730
2,592
kW-months/year
$(-17,010)
(-2,898)
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,540
Cost:
$5,580
- - - - $1,540 263 - - - - - - -
-
kWh
-
-
kW-months/year
$1,540
263
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,360
Cost:
$5,470
$980 24,619 $380 92 - - - - - - - - $980
24,619
kWh
$380
92
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,010
Cost:
$230
$780 19,930 $230 55 - - - - - - - - $780
19,930
kWh
$230
55
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$780
Cost:
$1,400
$780 19,930 - - - - - - - - - - $780
19,930
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$490
Cost:
$780
$170 4,396 $20 6 - - - - $300 - - - $170
4,396
kWh
$20
6
kW-months/year
-
-
MMBtu
-
-
lb
$300
-
$
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$370
Cost:
$810
$750 19,050 $90 21 $(-470) (-81) - - - - - - $750
19,050
kWh
$90
21
kW-months/year
$(-470)
(-81)
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$180
Cost:
$270
$140 3,517 $40 9 - - - - - - - - $140
3,517
kWh
$40
9
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 3.5221 RECYCLE CASTING SAND Savings:
$4,050
Cost:
-
- - - - - - $4,050 180,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,050
180,000
lb
-
-
$
-
-
$
10: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$3,340
Cost:
$300
- - - - - - - 250 - - $3,340 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
250
lb
-
-
$
$3,340
-
$
11: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$7,620
Cost:
-
- - - - - - - - $7,620 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$7,620
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$34,080
Cost:
$14,840
$23,220 588,511 $11,490 2,775 $(-15,940) (-2,716) $4,050 180,250 $7,920 - $3,340 - $23,220
588,511
kWh
$11,490
2,775
kW-months/year
$(-15,940)
(-2,716)
MMBtu
$4,050
180,250
lb
$7,920
-
$
$3,340
-
$
TOTAL IMPLEMENTED Savings:
$26,850
Cost:
$6,270
$21,520 545,135 $11,380 2,748 $(-17,010) (-2,898) - 250 $7,620 - $3,340 - $21,520
545,135
kWh
$11,380
2,748
kW-months/year
$(-17,010)
(-2,898)
MMBtu
-
250
lb
$7,620
-
$
$3,340
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material