IAC Assessment: KU0479
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0479
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1997
Principal Product grain bins
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 396,000
Annual Production 2,650 Pieces
Production Hrs. Annual 4,051
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $237,161 4,592,614 kWh $0.05
Electricity Demand $64,912 16,920 kW-months/year $3.84
Natural Gas $177,363 42,351 MMBtu $4.19
TOTAL ENERGY COSTS $1,518,725
RECOMMENDED SAVINGS* $279,364 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $93,510
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ gal $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,560
Cost:
$2,610
$8,650 167,644 $1,910 497 - - - - - - - - - - - - - - $8,650
167,644
kWh
$1,910
497
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,030
Cost:
$19,320
$3,850 74,736 $1,180 308 - - - - - - - - - - - - - - $3,850
74,736
kWh
$1,180
308
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,100
Cost:
$320
$2,540 49,238 $560 146 - - - - - - - - - - - - - - $2,540
49,238
kWh
$560
146
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,330
Cost:
$3,220
$1,590 30,774 $350 91 - - - - - - - - - - - - $390 - $1,590
30,774
kWh
$350
91
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
$390
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$590
Cost:
$450
$590 11,430 - - - - - - - - - - - - - - - - $590
11,430
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$540
Cost:
$780
$220 4,396 $20 6 - - - - - - - - - - $300 - - - $220
4,396
kWh
$20
6
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
$300
-
$
-
-
$
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$59,380
Cost:
$1,160
- - - - - - - - $18,810 2,200 - - - - - - $40,570 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$18,810
2,200
gal
-
-
gal
-
-
lb
-
-
$
$40,570
-
$
08: 3.8113 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) Savings:
$8,940
Cost:
$800
- - - - - - - - - - - - $2,200 3,250 $370 - $6,370 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
$2,200
3,250
lb
$370
-
$
$6,370
-
$
09: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$4,120
Cost:
$2,990
$(-270) (-5,275) $(-60) (-1) - - - - - - $3,170 153 - - - - $1,280 - $(-270)
(-5,275)
kWh
$(-60)
(-1)
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$3,170
153
gal
-
-
lb
-
-
$
$1,280
-
$
10: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$165,324
Cost:
$188,280
$230 4,689 - - $19,930 4,791 $744 204,979 - - - - - - $144,420 - - - $230
4,689
kWh
-
-
kW-months/year
$19,930
4,791
MMBtu
$744
204,979
Tgal
-
-
gal
-
-
gal
-
-
lb
$144,420
-
$
-
-
$
11: 4.452 ELIMINATE SHIFT Savings:
$19,450
Cost:
$16,980
- - - - - - - - - - - - - - $53,200 - $(-33,750) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
$53,200
-
$
$(-33,750)
-
$
TOTAL RECOMMENDED Savings:
$279,364
Cost:
$236,910
$17,400 337,632 $3,960 1,047 $19,930 4,791 $744 204,979 $18,810 2,200 $3,170 153 $2,200 3,250 $198,290 - $14,860 - $17,400
337,632
kWh
$3,960
1,047
kW-months/year
$19,930
4,791
MMBtu
$744
204,979
Tgal
$18,810
2,200
gal
$3,170
153
gal
$2,200
3,250
lb
$198,290
-
$
$14,860
-
$
TOTAL IMPLEMENTED Savings:
$93,510
Cost:
$23,740
$8,380 162,369 $1,850 496 - - - - $18,810 2,200 $3,170 153 - - $53,200 - $8,100 - $8,380
162,369
kWh
$1,850
496
kW-months/year
-
-
MMBtu
-
-
Tgal
$18,810
2,200
gal
$3,170
153
gal
-
-
lb
$53,200
-
$
$8,100
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Primary Raw Material