IAC logo
IAC Assessment: KU0483
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0483
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1997
Principal Product printed products
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 232,000
Annual Production 22,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $288,374 7,592,028 kWh $0.04
Electricity Demand $147,206 17,268 kW-months/year $8.52
Natural Gas $153,903 26,920 MMBtu $5.72
TOTAL ENERGY COSTS $2,436,747
RECOMMENDED SAVINGS* $11,600 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,320
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$3,330
Cost:
$1,300
$2,230 58,617 $1,100 127 - - $2,230
58,617
kWh
$1,100
127
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,820
Cost:
$7,770
$920 24,033 $900 104 - - $920
24,033
kWh
$900
104
kW-months/year
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,420
Cost:
$2,000
$1,420 37,222 - - - - $1,420
37,222
kWh
-
-
kW-months/year
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,300
Cost:
$80
$900 23,740 $400 46 - - $900
23,740
kWh
$400
46
kW-months/year
-
-
lb
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,200
Cost:
$270
$830 21,981 $370 42 - - $830
21,981
kWh
$370
42
kW-months/year
-
-
lb
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,530
Cost:
-
- - - - $2,530 86,000 -
-
kWh
-
-
kW-months/year
$2,530
86,000
lb
TOTAL RECOMMENDED Savings:
$11,600
Cost:
$11,420
$6,300 165,593 $2,770 319 $2,530 86,000 $6,300
165,593
kWh
$2,770
319
kW-months/year
$2,530
86,000
lb
TOTAL IMPLEMENTED Savings:
$4,320
Cost:
$8,120
$2,650 69,754 $1,670 192 - - $2,650
69,754
kWh
$1,670
192
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)