IAC logo
IAC Assessment: KU0485
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0485
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1997
Principal Product valves and switches
NAICS n/a
SIC 3823 - Process Control Instruments
Sales $5,000,000-$10,000,000
# of Employees 105
Plant Area (Sq.Ft.) 49,000
Annual Production 120,000 Pieces
Production Hrs. Annual 3,750
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,394 686,108 kWh $0.06
Electricity Demand $9,624 3,300 kW-months/year $2.92
Natural Gas $2,412 374 MMBtu $6.45
TOTAL ENERGY COSTS $134,615
RECOMMENDED SAVINGS* $134,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,650
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption Primary Product Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption Primary Product
$ kWh $ kW-months/year $ Tgal $ $ $ Tgal $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,310
Cost:
$190
$1,140 17,878 $170 57 - - - - - - - - $1,140
17,878
kWh
$170
57
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$560
Cost:
$660
$230 3,517 $20 5 - - $310 - - - - - $230
3,517
kWh
$20
5
kW-months/year
-
-
Tgal
$310
-
$
-
-
Tgal
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$470
Cost:
$300
$470 7,327 - - - - - - - - - - $470
7,327
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$230
Cost:
$40
$200 3,224 $30 10 - - - - - - - - $200
3,224
kWh
$30
10
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$2,170
Cost:
$5,260
- - - - $590 380,763 - - $1,580 - - - -
-
kWh
-
-
kW-months/year
$590
380,763
Tgal
-
-
$
$1,580
-
Tgal
-
-
$
06: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,080
Cost:
$1,180
- - - - $460 297,744 - - $620 - - - -
-
kWh
-
-
kW-months/year
$460
297,744
Tgal
-
-
$
$620
-
Tgal
-
-
$
07: 3.4155 METER WASTE WATER Savings:
$230
Cost:
$100
- - - - $230 - - - - - - - -
-
kWh
-
-
kW-months/year
$230
-
Tgal
-
-
$
-
-
Tgal
-
-
$
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$128,310
Cost:
$186,000
- - - - - - - - - - $128,310 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
$128,310
-
$
TOTAL RECOMMENDED Savings:
$134,360
Cost:
$193,730
$2,040 31,946 $220 72 $1,280 678,507 $310 - $2,200 - $128,310 - $2,040
31,946
kWh
$220
72
kW-months/year
$1,280
678,507
Tgal
$310
-
$
$2,200
-
Tgal
$128,310
-
$
TOTAL IMPLEMENTED Savings:
$3,650
Cost:
$2,430
$1,840 28,722 $190 62 $690 297,744 $310 - $620 - - - $1,840
28,722
kWh
$190
62
kW-months/year
$690
297,744
Tgal
$310
-
$
$620
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption Primary Product Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption Primary Product