IAC Assessment: KU0490
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0490
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1998
Principal Product fabricated structural & misc. steel products
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 85,000
Annual Production 4,200 Tons
Production Hrs. Annual 2,925
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,848 431,419 kWh $0.07
Electricity Demand $10,626 2,419 kW-months/year $4.39
Natural Gas $14,697 2,413 MMBtu $6.09
TOTAL ENERGY COSTS $165,896
RECOMMENDED SAVINGS* $20,150 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,180
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material Electricity Usage Electricity Demand Primary Raw Material
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,990
Cost:
$650
$2,370 34,291 $620 140 - - $2,370
34,291
kWh
$620
140
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$860
Cost:
$2,000
$670 9,672 $190 42 - - $670
9,672
kWh
$190
42
kW-months/year
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$710
Cost:
$1,510
$420 6,155 $110 25 $180 - $420
6,155
kWh
$110
25
kW-months/year
$180
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$620
Cost:
$340
$490 7,034 $130 29 - - $490
7,034
kWh
$130
29
kW-months/year
-
-
$
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$14,970
Cost:
$3,840
- - - - $14,970 - -
-
kWh
-
-
kW-months/year
$14,970
-
$
TOTAL RECOMMENDED Savings:
$20,150
Cost:
$8,340
$3,950 57,152 $1,050 236 $15,150 - $3,950
57,152
kWh
$1,050
236
kW-months/year
$15,150
-
$
TOTAL IMPLEMENTED Savings:
$5,180
Cost:
$4,500
$3,950 57,152 $1,050 236 $180 - $3,950
57,152
kWh
$1,050
236
kW-months/year
$180
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Raw Material Electricity Usage Electricity Demand Primary Raw Material