IAC logo
IAC Assessment: KU0491
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0491
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1998
Principal Product hydraulic/pneumatic jacks
NAICS n/a
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 146,400
Annual Production 16,655 Pieces
Production Hrs. Annual 4,100
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,344 1,912,954 kWh $0.04
Electricity Demand $23,716 6,300 kW-months/year $3.76
Natural Gas $59,292 10,883 MMBtu $5.45
TOTAL ENERGY COSTS $290,857
RECOMMENDED SAVINGS* $97,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,360
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,610
Cost:
$1,000
- - - - $1,610 300 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,610
300
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$760
Cost:
$2,630
$600 14,068 $160 42 - - - - - - - - - - $600
14,068
kWh
$160
42
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$640
Cost:
$780
$190 4,396 $20 6 - - - - $430 - - - - - $190
4,396
kWh
$20
6
kW-months/year
-
-
MMBtu
-
-
lb
$430
-
$
-
-
$
-
-
$
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$590
Cost:
$800
$590 13,775 - - - - - - - - - - - - $590
13,775
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$420
Cost:
$690
- - - - $420 79 - - - - - - - - -
-
kWh
-
-
kW-months/year
$420
79
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$370
Cost:
$1,140
$660 15,533 $60 17 $(-350) (-66) - - - - - - - - $660
15,533
kWh
$60
17
kW-months/year
$(-350)
(-66)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$240
Cost:
$210
$190 4,396 $50 13 - - - - - - - - - - $190
4,396
kWh
$50
13
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,650
Cost:
$7,000
- - - - - - $2,890 78,000 $(-240) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,890
78,000
lb
$(-240)
-
$
-
-
$
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,560
Cost:
-
- - - - - - $1,560 28,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,560
28,000
lb
-
-
$
-
-
$
-
-
$
10: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$54,580
Cost:
$150,500
$(-430) (-10,258) $(-110) (-29) - - - - $38,500 - $16,620 - - - $(-430)
(-10,258)
kWh
$(-110)
(-29)
kW-months/year
-
-
MMBtu
-
-
lb
$38,500
-
$
$16,620
-
$
-
-
$
11: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$34,550
Cost:
$60,000
- - - - - - - - $24,000 - - - $10,550 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$24,000
-
$
-
-
$
$10,550
-
$
TOTAL RECOMMENDED Savings:
$97,970
Cost:
$224,750
$1,800 41,910 $180 49 $1,680 313 $4,450 106,000 $62,690 - $16,620 - $10,550 - $1,800
41,910
kWh
$180
49
kW-months/year
$1,680
313
MMBtu
$4,450
106,000
lb
$62,690
-
$
$16,620
-
$
$10,550
-
$
TOTAL IMPLEMENTED Savings:
$39,360
Cost:
$64,620
$980 22,860 $230 61 $1,610 300 $1,560 28,000 $24,430 - - - $10,550 - $980
22,860
kWh
$230
61
kW-months/year
$1,610
300
MMBtu
$1,560
28,000
lb
$24,430
-
$
-
-
$
$10,550
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product