IAC Assessment: KU0497
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1998
Principal Product hydraulic cranes
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 63,000
Annual Production 500 Pieces
Production Hrs. Annual 4,940
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,724 928,488 kWh $0.06
Electricity Demand $16,362 2,649 kW-months/year $6.18
Natural Gas $46,233 9,124 MMBtu $5.07
TOTAL ENERGY COSTS $227,134
RECOMMENDED SAVINGS* $146,870 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,800
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.5115 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE Savings:
$5,550
Cost:
$12,730
$1,360 22,860 $510 83 $3,680 729 - - - - - - - - $1,360
22,860
kWh
$510
83
kW-months/year
$3,680
729
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,050
Cost:
$7,880
$2,410 40,152 $570 92 - - - - $1,070 - - - - - $2,410
40,152
kWh
$570
92
kW-months/year
-
-
MMBtu
-
-
lb
$1,070
-
$
-
-
$
-
-
$
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,080
Cost:
-
$3,080 51,290 - - - - - - - - - - - - $3,080
51,290
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$840
Cost:
$1,050
$300 4,982 $40 7 - - - - $500 - - - - - $300
4,982
kWh
$40
7
kW-months/year
-
-
MMBtu
-
-
lb
$500
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$480
Cost:
$450
$380 6,448 $100 15 - - - - - - - - - - $380
6,448
kWh
$100
15
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$78,000
Cost:
$8,990
- - - - - - - - - - $78,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$78,000
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,300
Cost:
$8,000
- - - - - - $8,040 154,000 $(-740) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,040
154,000
lb
$(-740)
-
$
-
-
$
-
-
$
08: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS Savings:
$1,220
Cost:
$260
- - - - - - - 645 - - $1,220 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
645
lb
-
-
$
$1,220
-
$
-
-
$
09: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$46,350
Cost:
$3,940
- - - - - - - - - - - - $46,350 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$46,350
-
$
TOTAL RECOMMENDED Savings:
$146,870
Cost:
$43,300
$7,530 125,732 $1,220 197 $3,680 729 $8,040 154,645 $830 - $79,220 - $46,350 - $7,530
125,732
kWh
$1,220
197
kW-months/year
$3,680
729
MMBtu
$8,040
154,645
lb
$830
-
$
$79,220
-
$
$46,350
-
$
TOTAL IMPLEMENTED Savings:
$54,800
Cost:
$13,320
$6,170 102,872 $710 114 - - - - $1,570 - - - $46,350 - $6,170
102,872
kWh
$710
114
kW-months/year
-
-
MMBtu
-
-
lb
$1,570
-
$
-
-
$
$46,350
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product