IAC Assessment: KU0507
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0507
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1998
Principal Product rubber belting
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 59,300
Annual Production 5,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,086 1,043,963 kWh $0.06
Electricity Demand $26,483 4,185 kW-months/year $6.33
Natural Gas $72,595 15,382 MMBtu $4.72
TOTAL ENERGY COSTS $204,942
RECOMMENDED SAVINGS* $29,600 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,870
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,100
Cost:
$9,690
$3,290 58,324 $810 127 - - - - $3,290
58,324
kWh
$810
127
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$900
Cost:
$1,190
- - - - $900 191 - - -
-
kWh
-
-
kW-months/year
$900
191
MMBtu
-
-
Tgal
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$870
Cost:
$7,500
$640 11,430 $230 37 - - - - $640
11,430
kWh
$230
37
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$540
Cost:
$430
$360 6,448 $180 28 - - - - $360
6,448
kWh
$180
28
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$520
Cost:
$890
$370 6,741 $150 24 - - - - $370
6,741
kWh
$150
24
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$320
Cost:
$200
$320 5,862 - - - - - - $320
5,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$22,350
Cost:
$790
$(-1,820) (-32,239) $(-30) (-5) - - $24,200 6,257,250 $(-1,820)
(-32,239)
kWh
$(-30)
(-5)
kW-months/year
-
-
MMBtu
$24,200
6,257,250
Tgal
TOTAL RECOMMENDED Savings:
$29,600
Cost:
$20,690
$3,160 56,566 $1,340 211 $900 191 $24,200 6,257,250 $3,160
56,566
kWh
$1,340
211
kW-months/year
$900
191
MMBtu
$24,200
6,257,250
Tgal
TOTAL IMPLEMENTED Savings:
$27,870
Cost:
$12,560
$1,840 32,826 $930 146 $900 191 $24,200 6,257,250 $1,840
32,826
kWh
$930
146
kW-months/year
$900
191
MMBtu
$24,200
6,257,250
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal