IAC Assessment: KU0510
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0510
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1998
Principal Product water pumps
NAICS n/a
SIC 3561 - Pumps And Pumping Equipment
Sales $5,000,000-$10,000,000
# of Employees 59
Plant Area (Sq.Ft.) 300,000
Annual Production 10,850 Pieces
Production Hrs. Annual 2,125
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,576 970,985 kWh $0.02
Electricity Demand $32,402 3,458 kW-months/year $9.37
Natural Gas $69,938 15,730 MMBtu $4.45
TOTAL ENERGY COSTS $142,959
RECOMMENDED SAVINGS* $32,070 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,820
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$6,740
Cost:
$200
- - - - - - - - - - $6,740 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$6,740
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,400
Cost:
$4,710
$710 33,411 $1,770 189 - - - - $920 - - - $710
33,411
kWh
$1,770
189
kW-months/year
-
-
MMBtu
-
-
gal
$920
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,670
Cost:
$900
$480 22,567 $1,190 127 - - - - - - - - $480
22,567
kWh
$1,190
127
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$350
Cost:
$1,000
- - - - $350 79 - - - - - - -
-
kWh
-
-
kW-months/year
$350
79
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$310
Cost:
$400
$90 4,103 $220 23 - - - - - - - - $90
4,103
kWh
$220
23
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
06: 3.2124 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS Savings:
$14,350
Cost:
$8,630
- - - - - - - - - - $14,350 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$14,350
-
$
07: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$3,900
Cost:
$11,720
- - - - - - $670 531 - - $3,230 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$670
531
gal
-
-
$
$3,230
-
$
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$1,350
Cost:
$2,310
- - - - - - - - $1,350 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,350
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,070
Cost:
$29,870
$1,280 60,081 $3,180 339 $350 79 $670 531 $2,270 - $24,320 - $1,280
60,081
kWh
$3,180
339
kW-months/year
$350
79
MMBtu
$670
531
gal
$2,270
-
$
$24,320
-
$
TOTAL IMPLEMENTED Savings:
$13,820
Cost:
$9,520
$1,280 60,081 $3,180 339 $350 79 - - $2,270 - $6,740 - $1,280
60,081
kWh
$3,180
339
kW-months/year
$350
79
MMBtu
-
-
gal
$2,270
-
$
$6,740
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost