IAC logo
IAC Assessment: KU0511
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0511
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1998
Principal Product hand tools
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 126,675
Annual Production 4,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,143 7,856,389 kWh $0.02
Electricity Demand $159,650 18,142 kW-months/year $8.80
Natural Gas $70,927 13,494 MMBtu $5.26
TOTAL ENERGY COSTS $572,230
RECOMMENDED SAVINGS* $163,690 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,990
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$25,680
Cost:
$19,610
- - - - $25,680 4,900 - - - - - - -
-
kWh
-
-
kW-months/year
$25,680
4,900
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,600
Cost:
$32,720
$17,690 907,093 $11,180 1,270 $(-20,270) (-3,869) - - - - - - $17,690
907,093
kWh
$11,180
1,270
kW-months/year
$(-20,270)
(-3,869)
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$3,080
Cost:
$3,040
$1,920 98,183 $1,160 132 - - - - - - - - $1,920
98,183
kWh
$1,160
132
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,570
Cost:
$2,550
- - - - $2,570 491 - - - - - - -
-
kWh
-
-
kW-months/year
$2,570
491
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,560
Cost:
$800
$1,350 68,875 $1,210 138 - - - - - - - - $1,350
68,875
kWh
$1,210
138
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,670
Cost:
$3,960
$560 28,429 $470 53 - - $640 - - - - - $560
28,429
kWh
$470
53
kW-months/year
-
-
MMBtu
$640
-
$
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$590
Cost:
$360
$310 15,826 $280 32 - - - - - - - - $310
15,826
kWh
$280
32
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$230
Cost:
$680
$30 1,465 $50 6 $150 28 - - - - - - $30
1,465
kWh
$50
6
kW-months/year
$150
28
MMBtu
-
-
$
-
-
$
-
-
$
09: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$75,530
Cost:
-
- - - - - - - - - - $75,530 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$75,530
-
$
10: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$15,070
Cost:
$17,000
- - - - - - - - - - $15,070 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$15,070
-
$
11: 4.446 AUTOMATE FINISHING PROCESS Savings:
$12,150
Cost:
$42,810
- - - - - - $12,150 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,150
-
$
-
-
$
-
-
$
12: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$5,560
Cost:
$690
- - - - - - $6,080 - $(-520) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,080
-
$
$(-520)
-
$
-
-
$
13: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$4,980
Cost:
$10,000
- - - - - - - - $4,980 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,980
-
$
-
-
$
14: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$4,120
Cost:
$4,400
$710 36,342 $480 55 - - $(-39,160) - - - $42,090 - $710
36,342
kWh
$480
55
kW-months/year
-
-
MMBtu
$(-39,160)
-
$
-
-
$
$42,090
-
$
15: 4.222 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW Savings:
$1,300
Cost:
$800
- - - - - - $1,420 - $(-120) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,420
-
$
$(-120)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$163,690
Cost:
$139,420
$22,570 1,156,213 $14,830 1,686 $8,130 1,550 $(-18,870) - $4,340 - $132,690 - $22,570
1,156,213
kWh
$14,830
1,686
kW-months/year
$8,130
1,550
MMBtu
$(-18,870)
-
$
$4,340
-
$
$132,690
-
$
TOTAL IMPLEMENTED Savings:
$61,990
Cost:
$58,690
$4,170 212,778 $3,170 361 $28,400 5,419 $6,720 - $4,460 - $15,070 - $4,170
212,778
kWh
$3,170
361
kW-months/year
$28,400
5,419
MMBtu
$6,720
-
$
$4,460
-
$
$15,070
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product