IAC Assessment: KU0515
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0515
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1999
Principal Product roll-forming machinery
NAICS n/a
SIC 3547 - Rolling Mill Machinery
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 160,875
Annual Production 75 Pieces
Production Hrs. Annual 4,602
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,913 2,877,198 kWh $0.03
Electricity Demand $67,115 8,328 kW-months/year $8.06
Natural Gas $7,469 1,747 MMBtu $4.28
TOTAL ENERGY COSTS $606,803
RECOMMENDED SAVINGS* $408,930 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $406,450
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,780
Cost:
$400
$1,520 59,789 $1,260 156 - - - - - - - - $1,520
59,789
kWh
$1,260
156
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,660
Cost:
$2,430
$250 9,672 $390 48 - - $1,020 - - - - - $250
9,672
kWh
$390
48
kW-months/year
-
-
MMBtu
$1,020
-
$
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$820
Cost:
$2,540
- - - - $820 200 - - - - - - -
-
kWh
-
-
kW-months/year
$820
200
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$530
Cost:
-
$530 20,516 - - - - - - - - - - $530
20,516
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$3,140
Cost:
$7,830
- - - - - - - - $3,140 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,140
-
$
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$400,000
Cost:
$602,110
- - - - - - - - - - $400,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$400,000
-
$
TOTAL RECOMMENDED Savings:
$408,930
Cost:
$615,310
$2,300 89,977 $1,650 204 $820 200 $1,020 - $3,140 - $400,000 - $2,300
89,977
kWh
$1,650
204
kW-months/year
$820
200
MMBtu
$1,020
-
$
$3,140
-
$
$400,000
-
$
TOTAL IMPLEMENTED Savings:
$406,450
Cost:
$610,340
$2,050 80,305 $1,260 156 - - - - $3,140 - $400,000 - $2,050
80,305
kWh
$1,260
156
kW-months/year
-
-
MMBtu
-
-
$
$3,140
-
$
$400,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product