IAC logo
IAC Assessment: KU0520
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0520
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1999
Principal Product wide-belt sanding machines
NAICS n/a
SIC 3553 - Woodworking Machinery
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 98,700
Annual Production 500 Pieces
Production Hrs. Annual 2,080
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,781 1,259,086 kWh $0.04
Electricity Demand $24,050 5,168 kW-months/year $4.65
Natural Gas $23,201 4,465 MMBtu $5.20
TOTAL ENERGY COSTS $129,137
RECOMMENDED SAVINGS* $21,920 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,620
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $ $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,880
Cost:
$4,000
- - $5,010 - $870 - - - - - - - - - - - - - -
-
kWh
$5,010
-
kW-months/year
$870
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$690
Cost:
$1,080
$150 4,689 $40 9 - - - - - - - - $500 - - - - - $150
4,689
kWh
$40
9
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$500
-
$
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$410
Cost:
$670
- - - - - - $410 79 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$410
79
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$250
Cost:
$250
$130 4,103 $120 23 - - - - - - - - - - - - - - $130
4,103
kWh
$120
23
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$210
Cost:
$350
$110 3,517 $100 20 - - - - - - - - - - - - - - $110
3,517
kWh
$100
20
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
06: 3.5142 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS Savings:
$3,440
Cost:
$3,630
- - - - - - - - $350 44,130 $3,090 440 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$350
44,130
Tgal
$3,090
440
gal
-
-
$
-
-
$
-
-
$
07: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$6,720
Cost:
$8,000
- - - - - - - - - - - - - - $6,720 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
$6,720
-
$
-
-
$
08: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$4,320
Cost:
$9,500
- - - - - - - - - - - - - - - - $4,320 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
$4,320
-
$
TOTAL RECOMMENDED Savings:
$21,920
Cost:
$27,480
$390 12,309 $5,270 52 $870 - $410 79 $350 44,130 $3,090 440 $500 - $6,720 - $4,320 - $390
12,309
kWh
$5,270
52
kW-months/year
$870
-
$
$410
79
MMBtu
$350
44,130
Tgal
$3,090
440
gal
$500
-
$
$6,720
-
$
$4,320
-
$
TOTAL IMPLEMENTED Savings:
$10,620
Cost:
$12,230
$240 7,620 $220 43 - - - - $350 44,130 $3,090 440 - - $6,720 - - - $240
7,620
kWh
$220
43
kW-months/year
-
-
$
-
-
MMBtu
$350
44,130
Tgal
$3,090
440
gal
-
-
$
$6,720
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost