Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1999 |
Principal Product | dried soy, rice & milk products |
NAICS | n/a |
SIC | 2023 - Dry, Condensed, Evaporated Products |
Sales | $1,000,000-$5,000,000 |
# of Employees | 37 |
Plant Area (Sq.Ft.) | 77,570 |
Annual Production | 5,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $205,410 | 4,551,876 | kWh | $0.05 |
Electricity Demand | $106,357 | 13,664 | kW-months/year | $7.78 |
Natural Gas | $330,180 | 109,368 | MMBtu | $3.02 |
TOTAL ENERGY COSTS | $661,327 | |||
RECOMMENDED SAVINGS* | $24,520 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,520 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $9,520 Cost: $18,350 |
- | - | - | - | $9,520 | 3,153 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,520 3,153 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $9,110 Cost: $2,500 |
- | - | - | - | $9,110 | 3,018 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,110 3,018 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,820 Cost: $3,790 |
$1,210 | 27,550 | $400 | 60 | - | - | $1,210 | - | - | - | - | - |
$1,210 27,550 kWh |
$400 60 kW-months/year |
- - MMBtu |
$1,210 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,070 Cost: $1,270 |
$680 | 15,533 | $390 | 59 | - | - | - | - | - | - | - | - |
$680 15,533 kWh |
$390 59 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $750 Cost: $680 |
- | - | - | - | $750 | 248 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$750 248 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $650 Cost: $1,160 |
$370 | 8,206 | $210 | 32 | - | - | - | - | - | - | $70 | - |
$370 8,206 kWh |
$210 32 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$70 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $600 Cost: - |
- | - | - | - | - | - | - | - | $600 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$600 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,520 Cost: $27,750 |
$2,260 | 51,289 | $1,000 | 151 | $19,380 | 6,419 | $1,210 | - | $600 | - | $70 | - | $2,260 51,289 kWh |
$1,000 151 kW-months/year |
$19,380 6,419 MMBtu |
$1,210 - $ |
$600 - $ |
$70 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,520 Cost: $27,750 |
$2,260 | 51,289 | $1,000 | 151 | $19,380 | 6,419 | $1,210 | - | $600 | - | $70 | - | $2,260 51,289 kWh |
$1,000 151 kW-months/year |
$19,380 6,419 MMBtu |
$1,210 - $ |
$600 - $ |
$70 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost |