IAC Assessment: KU0535
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1999
Principal Product vinyl siding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 250
Plant Area (Sq.Ft.) 180,000
Annual Production 80,000,000 Pounds
Production Hrs. Annual 8,280
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $413,833 16,307,738 kWh $0.03
Electricity Demand $268,139 29,771 kW-months/year $9.01
Natural Gas $32,275 8,015 MMBtu $4.03
TOTAL ENERGY COSTS $714,247
RECOMMENDED SAVINGS* $151,500 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,650
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$16,650
Cost:
$200
- - - - - - $16,650 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$16,650
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,250
Cost:
$2,640
$4,420 197,538 $2,830 382 - - - - - - $4,420
197,538
kWh
$2,830
382
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$1,870
Cost:
$1,250
$1,870 83,529 - - - - - - - - $1,870
83,529
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$530
Cost:
$900
$90 4,103 $40 6 $400 - - - - - $90
4,103
kWh
$40
6
kW-months/year
$400
-
$
-
-
$
-
-
$
05: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$125,200
Cost:
$140,000
$(-2,770) (-123,681) $(-1,330) (-179) $69,970 - - - $59,330 - $(-2,770)
(-123,681)
kWh
$(-1,330)
(-179)
kW-months/year
$69,970
-
$
-
-
$
$59,330
-
$
TOTAL RECOMMENDED Savings:
$151,500
Cost:
$144,990
$3,610 161,489 $1,540 209 $70,370 - $16,650 - $59,330 - $3,610
161,489
kWh
$1,540
209
kW-months/year
$70,370
-
$
$16,650
-
$
$59,330
-
$
TOTAL IMPLEMENTED Savings:
$9,650
Cost:
$4,790
$6,380 285,170 $2,870 388 $400 - - - - - $6,380
285,170
kWh
$2,870
388
kW-months/year
$400
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product