IAC Assessment: KU0539
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0539
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 2000
Principal Product coffee
NAICS n/a
SIC 2095 - Roasted Coffee
Sales $100,000,000-$500,000,000
# of Employees 235
Plant Area (Sq.Ft.) 150,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $489,342 13,619,871 kWh $0.04
Electricity Demand $227,526 26,976 kW-months/year $8.43
Natural Gas $703,564 232,065 MMBtu $3.03
Other Energy $125,455 9,658 MMBtu $12.99
TOTAL ENERGY COSTS $1,656,222
RECOMMENDED SAVINGS* $313,270 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,700
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$163,360
Cost:
$135,000
- - - - $163,360 54,090 - - - - - - -
-
kWh
-
-
kW-months/year
$163,360
54,090
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$44,700
Cost:
$30,000
- - - - $44,700 14,800 - - - - - - -
-
kWh
-
-
kW-months/year
$44,700
14,800
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$15,700
Cost:
$20,000
- - - - $15,700 5,200 - - - - - - -
-
kWh
-
-
kW-months/year
$15,700
5,200
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,800
Cost:
-
- - $6,800 585 - - - - - - $(-4,000) - -
-
kWh
$6,800
585
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$(-4,000)
-
$
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$9,070
Cost:
$5,750
$(-290) (-11,723) $(-380) (-32) - - - - $9,740 5,781,600 - - $(-290)
(-11,723)
kWh
$(-380)
(-32)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$9,740
5,781,600
Tgal
-
-
$
06: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE Savings:
$77,640
Cost:
$85,000
- - - - $(-47,810) (-10,673) $125,450 9,658 - - - - -
-
kWh
-
-
kW-months/year
$(-47,810)
(-10,673)
MMBtu
$125,450
9,658
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$313,270
Cost:
$275,750
$(-290) (-11,723) $6,420 553 $175,950 63,417 $125,450 9,658 $9,740 5,781,600 $(-4,000) - $(-290)
(-11,723)
kWh
$6,420
553
kW-months/year
$175,950
63,417
MMBtu
$125,450
9,658
MMBtu
$9,740
5,781,600
Tgal
$(-4,000)
-
$
TOTAL IMPLEMENTED Savings:
$15,700
Cost:
$20,000
- - - - $15,700 5,200 - - - - - - -
-
kWh
-
-
kW-months/year
$15,700
5,200
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Personnel Changes