IAC Assessment: LE0102
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0102
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2001
Principal Product Heat treated strip steel
NAICS n/a
SIC 3312 - Blast Furnaces And Steel Mills
Sales $5,000,000-$10,000,000
# of Employees 34
Plant Area (Sq.Ft.) 42,000
Annual Production 7,500,000 Pounds
Production Hrs. Annual 2,250
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,955 1,406,652 kWh $0.09
Electricity Demand $3,774 304 kW-months/year $12.41
Natural Gas $152,993 24,827 MMBtu $6.16
TOTAL ENERGY COSTS $308,222
RECOMMENDED SAVINGS* $49,466 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $
01: 2.2514 COVER OPEN TANKS Savings:
$2,872
Cost:
$850
- - - - - - $2,872 658 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,872
658
MMBtu
-
-
Tgal
-
-
gal
-
-
$
02: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$20,280
Cost:
$9,800
- - - - - - - - - - - - $20,280 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$20,280
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$255
Cost:
$550
$200 2,156 $55 7 - - - - - - - - - - $200
2,156
kWh
$55
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$236
Cost:
-
$194 2,172 $42 6 - - - - - - - - - - $194
2,172
kWh
$42
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$6,500
Cost:
-
- - - - - - - - - - $6,500 300 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$6,500
300
gal
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$15,000
Cost:
$11,500
- - - - - - - - $15,000 1,666 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$15,000
1,666
Tgal
-
-
gal
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,323
Cost:
-
- - - - $4,323 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,323
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$49,466
Cost:
$22,700
$394 4,328 $97 13 $4,323 - $2,872 658 $15,000 1,666 $6,500 300 $20,280 - $394
4,328
kWh
$97
13
kW-months/year
$4,323
-
$
$2,872
658
MMBtu
$15,000
1,666
Tgal
$6,500
300
gal
$20,280
-
$
TOTAL IMPLEMENTED Savings:
$6,500
Cost:
-
- - - - - - - - - - $6,500 300 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$6,500
300
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Primary Product