IAC logo
IAC Assessment: LE0103
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0103
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2001
Principal Product Nonferrous castings
NAICS n/a
SIC 3369 - Nonferrous Foundries, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 50,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 2,250
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,165 1,991,440 kWh $0.08
Electricity Demand $1,416 1,416 kW-months/year $1.00
Natural Gas $39,954 5,963 MMBtu $6.70
TOTAL ENERGY COSTS $204,535
RECOMMENDED SAVINGS* $74,747 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,158
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$14,809
Cost:
$49,595
$14,809 185,114 - - - - - - $14,809
185,114
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$16,104
Cost:
-
- - $16,104 200 - - - - -
-
kWh
$16,104
200
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,154
Cost:
$1,600
$1,314 16,420 $443 6 $(-603) (-90) - - $1,314
16,420
kWh
$443
6
kW-months/year
$(-603)
(-90)
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$14,904
Cost:
$12,900
$12,830 160,380 $5,739 71 $(-3,665) (-547) - - $12,830
160,380
kWh
$5,739
71
kW-months/year
$(-3,665)
(-547)
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,676
Cost:
$7,500
$7,566 94,578 $3,110 84 - - - - $7,566
94,578
kWh
$3,110
84
kW-months/year
-
-
MMBtu
-
-
$
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$17,100
Cost:
$12,300
- - - - - - $17,100 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,100
-
$
TOTAL RECOMMENDED Savings:
$74,747
Cost:
$83,895
$36,519 456,492 $25,396 361 $(-4,268) (-637) $17,100 - $36,519
456,492
kWh
$25,396
361
kW-months/year
$(-4,268)
(-637)
MMBtu
$17,100
-
$
TOTAL IMPLEMENTED Savings:
$33,158
Cost:
$26,800
$14,144 176,800 $6,182 77 $(-4,268) (-637) $17,100 - $14,144
176,800
kWh
$6,182
77
kW-months/year
$(-4,268)
(-637)
MMBtu
$17,100
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $