Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2001 |
Principal Product | Plastic Parts |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 196 |
Plant Area (Sq.Ft.) | 159,000 |
Annual Production | 13,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $449,590 | 7,919,625 | kWh | $0.06 |
Electricity Demand | $151,983 | 13,061 | kW-months/year | $11.64 |
Fuel Oil #2 | $12,128 | 1,561 | MMBtu | $7.77 |
TOTAL ENERGY COSTS | $614,110 | |||
RECOMMENDED SAVINGS* | $55,437 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,278 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $582 Cost: $640 |
$331 | 8,703 | $251 | 31 | - | - | - | - |
$331 8,703 kWh |
$251 31 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $12,119 Cost: - |
$6,667 | 175,459 | $5,452 | 537 | - | - | - | - |
$6,667 175,459 kWh |
$5,452 537 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $5,466 Cost: $400 |
$3,750 | 98,682 | $1,716 | 211 | - | - | - | - |
$3,750 98,682 kWh |
$1,716 211 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $1,159 Cost: - |
- | - | - | - | - | - | $1,159 | 15,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,159 15,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $22,798 Cost: $2,500 |
- | - | $22,798 | 2,809 | - | - | - | - |
- - kWh |
$22,798 2,809 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $6,128 Cost: $680 |
$6,128 | 67,814 | - | - | - | - | - | - |
$6,128 67,814 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $7,185 Cost: $5,520 |
- | - | - | - | $7,185 | 941 | - | - |
- - kWh |
- - kW-months/year |
$7,185 941 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $55,437 Cost: $9,740 |
$16,876 | 350,658 | $30,217 | 3,588 | $7,185 | 941 | $1,159 | 15,000 | $16,876 350,658 kWh |
$30,217 3,588 kW-months/year |
$7,185 941 MMBtu |
$1,159 15,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,278 Cost: - |
$6,667 | 175,459 | $5,452 | 537 | - | - | $1,159 | 15,000 | $6,667 175,459 kWh |
$5,452 537 kW-months/year |
- - MMBtu |
$1,159 15,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) |