IAC Assessment: LE0112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2001
Principal Product Plastic Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 196
Plant Area (Sq.Ft.) 159,000
Annual Production 13,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $449,590 7,919,625 kWh $0.06
Electricity Demand $151,983 13,061 kW-months/year $11.64
Fuel Oil #2 $12,128 1,561 MMBtu $7.77
TOTAL ENERGY COSTS $614,110
RECOMMENDED SAVINGS* $55,437 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,278
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$582
Cost:
$640
$331 8,703 $251 31 - - - - $331
8,703
kWh
$251
31
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$12,119
Cost:
-
$6,667 175,459 $5,452 537 - - - - $6,667
175,459
kWh
$5,452
537
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$5,466
Cost:
$400
$3,750 98,682 $1,716 211 - - - - $3,750
98,682
kWh
$1,716
211
kW-months/year
-
-
MMBtu
-
-
lb
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,159
Cost:
-
- - - - - - $1,159 15,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,159
15,000
lb
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$22,798
Cost:
$2,500
- - $22,798 2,809 - - - - -
-
kWh
$22,798
2,809
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,128
Cost:
$680
$6,128 67,814 - - - - - - $6,128
67,814
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$7,185
Cost:
$5,520
- - - - $7,185 941 - - -
-
kWh
-
-
kW-months/year
$7,185
941
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$55,437
Cost:
$9,740
$16,876 350,658 $30,217 3,588 $7,185 941 $1,159 15,000 $16,876
350,658
kWh
$30,217
3,588
kW-months/year
$7,185
941
MMBtu
$1,159
15,000
lb
TOTAL IMPLEMENTED Savings:
$13,278
Cost:
-
$6,667 175,459 $5,452 537 - - $1,159 15,000 $6,667
175,459
kWh
$5,452
537
kW-months/year
-
-
MMBtu
$1,159
15,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz)