IAC Assessment: LE0118
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0118
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2001
Principal Product Material handling cranes & monrail systems
NAICS n/a
SIC 3536 - Hoists, Cranes, And Monorails
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 95,000
Annual Production 0 Units
Production Hrs. Annual 2,080
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,539 529,500 kWh $0.09
Electricity Demand $17,209 2,483 kW-months/year $6.93
Natural Gas $29,724 3,250 MMBtu $9.15
TOTAL ENERGY COSTS $93,472
RECOMMENDED SAVINGS* $9,421 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,249
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,581
Cost:
$2,500
- - $2,581 372 - - -
-
kWh
$2,581
372
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,252
Cost:
-
$3,610 41,068 $1,642 237 - - $3,610
41,068
kWh
$1,642
237
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$769
Cost:
$135
$437 4,975 $332 48 - - $437
4,975
kWh
$332
48
kW-months/year
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$480
Cost:
-
$170 1,939 $310 45 - - $170
1,939
kWh
$310
45
kW-months/year
-
-
MMBtu
05: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$339
Cost:
$1,615
- - - - $339 37 -
-
kWh
-
-
kW-months/year
$339
37
MMBtu
TOTAL RECOMMENDED Savings:
$9,421
Cost:
$4,250
$4,217 47,982 $4,865 702 $339 37 $4,217
47,982
kWh
$4,865
702
kW-months/year
$339
37
MMBtu
TOTAL IMPLEMENTED Savings:
$1,249
Cost:
$135
$607 6,914 $642 93 - - $607
6,914
kWh
$642
93
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas