Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2002 |
Principal Product | Aluminum and Iron Salts |
NAICS | n/a |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 47 |
Plant Area (Sq.Ft.) | 22,865 |
Annual Production | 85,000,000 Pounds |
Production Hrs. Annual | 8,112 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $89,388 | 930,500 | kWh | $0.10 |
Electricity Demand | $17,148 | 2,064 | kW-months/year | $8.31 |
Fuel Oil #2 | $25,187 | 3,296 | MMBtu | $7.64 |
TOTAL ENERGY COSTS | $131,723 | |||
RECOMMENDED SAVINGS* | $24,020 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,798 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $6,102 Cost: $390 |
- | - | - | - | $6,102 | 799 | - | - |
- - kWh |
- - kW-months/year |
$6,102 799 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,467 Cost: - |
$5,467 | 70,634 | - | - | - | - | - | - |
$5,467 70,634 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $4,515 Cost: $4,320 |
- | - | - | - | $4,515 | 591 | - | - |
- - kWh |
- - kW-months/year |
$4,515 591 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $2,573 Cost: $2,500 |
- | - | $2,573 | 310 | - | - | - | - |
- - kWh |
$2,573 310 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,916 Cost: - |
$1,562 | 20,184 | $354 | 43 | - | - | - | - |
$1,562 20,184 kWh |
$354 43 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,511 Cost: $500 |
- | - | - | - | $1,511 | 198 | - | - |
- - kWh |
- - kW-months/year |
$1,511 198 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $1,283 Cost: $200 |
$1,107 | 14,297 | $176 | 21 | - | - | - | - |
$1,107 14,297 kWh |
$176 21 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $653 Cost: - |
- | - | - | - | - | - | $653 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$653 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,020 Cost: $7,910 |
$8,136 | 105,115 | $3,103 | 374 | $12,128 | 1,588 | $653 | - | $8,136 105,115 kWh |
$3,103 374 kW-months/year |
$12,128 1,588 MMBtu |
$653 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,798 Cost: $4,520 |
$1,107 | 14,297 | $176 | 21 | $4,515 | 591 | - | - | $1,107 14,297 kWh |
$176 21 kW-months/year |
$4,515 591 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) |