IAC Assessment: LE0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2002
Principal Product Aluminum and Iron Salts
NAICS n/a
SIC 2899 - Chemical Preparations, Nec
Sales $5,000,000-$10,000,000
# of Employees 47
Plant Area (Sq.Ft.) 22,865
Annual Production 85,000,000 Pounds
Production Hrs. Annual 8,112
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,388 930,500 kWh $0.10
Electricity Demand $17,148 2,064 kW-months/year $8.31
Fuel Oil #2 $25,187 3,296 MMBtu $7.64
TOTAL ENERGY COSTS $131,723
RECOMMENDED SAVINGS* $24,020 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,798
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,102
Cost:
$390
- - - - $6,102 799 - - -
-
kWh
-
-
kW-months/year
$6,102
799
MMBtu
-
-
lb
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,467
Cost:
-
$5,467 70,634 - - - - - - $5,467
70,634
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$4,515
Cost:
$4,320
- - - - $4,515 591 - - -
-
kWh
-
-
kW-months/year
$4,515
591
MMBtu
-
-
lb
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,573
Cost:
$2,500
- - $2,573 310 - - - - -
-
kWh
$2,573
310
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,916
Cost:
-
$1,562 20,184 $354 43 - - - - $1,562
20,184
kWh
$354
43
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,511
Cost:
$500
- - - - $1,511 198 - - -
-
kWh
-
-
kW-months/year
$1,511
198
MMBtu
-
-
lb
07: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,283
Cost:
$200
$1,107 14,297 $176 21 - - - - $1,107
14,297
kWh
$176
21
kW-months/year
-
-
MMBtu
-
-
lb
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$653
Cost:
-
- - - - - - $653 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$653
-
lb
TOTAL RECOMMENDED Savings:
$24,020
Cost:
$7,910
$8,136 105,115 $3,103 374 $12,128 1,588 $653 - $8,136
105,115
kWh
$3,103
374
kW-months/year
$12,128
1,588
MMBtu
$653
-
lb
TOTAL IMPLEMENTED Savings:
$5,798
Cost:
$4,520
$1,107 14,297 $176 21 $4,515 591 - - $1,107
14,297
kWh
$176
21
kW-months/year
$4,515
591
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz)