IAC logo
IAC Assessment: LE0130
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0130
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2002
Principal Product Automobile Bearings
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 268,000
Annual Production 3,126,000 Pieces
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $757,404 16,880,946 kWh $0.04
Electricity Demand $223,035 35,426 kW-months/year $6.30
Natural Gas $450,560 57,490 MMBtu $7.84
TOTAL ENERGY COSTS $1,430,999
RECOMMENDED SAVINGS* $147,149 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,506
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,934
Cost:
$150
$5,027 100,740 $907 144 - - - - $5,027
100,740
kWh
$907
144
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$583
Cost:
$180
- - - - $583 74 - - -
-
kWh
-
-
kW-months/year
$583
74
MMBtu
-
-
Tgal
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,040
Cost:
-
- - - - - - $2,040 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,040
-
Tgal
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$8,789
Cost:
$1,000
- - - - $8,789 1,121 - - -
-
kWh
-
-
kW-months/year
$8,789
1,121
MMBtu
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$16,677
Cost:
-
$10,567 235,338 $6,110 970 - - - - $10,567
235,338
kWh
$6,110
970
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$7,373
Cost:
$400
$7,132 158,832 $241 38 - - - - $7,132
158,832
kWh
$241
38
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$105,753
Cost:
$60,000
$57,374 1,277,816 $48,379 7,679 - - - - $57,374
1,277,816
kWh
$48,379
7,679
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$147,149
Cost:
$61,730
$80,100 1,772,726 $55,637 8,831 $9,372 1,195 $2,040 - $80,100
1,772,726
kWh
$55,637
8,831
kW-months/year
$9,372
1,195
MMBtu
$2,040
-
Tgal
TOTAL IMPLEMENTED Savings:
$27,506
Cost:
$1,000
$10,567 235,338 $6,110 970 $8,789 1,121 $2,040 - $10,567
235,338
kWh
$6,110
970
kW-months/year
$8,789
1,121
MMBtu
$2,040
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal