IAC Assessment: LE0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2002
Principal Product Marking Devices
NAICS n/a
SIC 3953 - Marking Devices
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 86,000
Annual Production 0 Units
Production Hrs. Annual 2,080
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,127 884,400 kWh $0.11
Electricity Demand $30,341 7,346 kW-months/year $4.13
Fuel Oil #2 $20,271 3,410 MMBtu $5.94
TOTAL ENERGY COSTS $143,739
RECOMMENDED SAVINGS* $9,454 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,079
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,545
Cost:
$2,500
- - $4,545 477 - - -
-
kWh
$4,545
477
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,009
Cost:
$1,000
$462 6,506 $547 57 - - $462
6,506
kWh
$547
57
kW-months/year
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,286
Cost:
-
$1,157 16,293 $1,129 118 - - $1,157
16,293
kWh
$1,129
118
kW-months/year
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$166
Cost:
$195
- - - - $166 28 -
-
kWh
-
-
kW-months/year
$166
28
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$655
Cost:
$6,500
- - - - $655 110 -
-
kWh
-
-
kW-months/year
$655
110
MMBtu
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$793
Cost:
$400
$346 4,880 $447 47 - - $346
4,880
kWh
$447
47
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,454
Cost:
$10,595
$1,965 27,679 $6,668 699 $821 138 $1,965
27,679
kWh
$6,668
699
kW-months/year
$821
138
MMBtu
TOTAL IMPLEMENTED Savings:
$3,079
Cost:
$400
$1,503 21,173 $1,576 165 - - $1,503
21,173
kWh
$1,576
165
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2