IAC Assessment: LE0158
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0158
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2003
Principal Product Manufacturing Pipe, Duct, Metal Fitting for Residential Housing
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 210,000
Annual Production 0 Pieces
Production Hrs. Annual 2,080
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,620 1,916,200 kWh $0.06
Electricity Demand $58,105 4,830 kW-months/year $12.03
Natural Gas $53,393 4,763 MMBtu $11.21
TOTAL ENERGY COSTS $230,118
RECOMMENDED SAVINGS* $38,115 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,085
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$15,242
Cost:
-
- - - - - - $15,242 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,242
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,841
Cost:
$6,250
$3,841 62,059 - - - - - - $3,841
62,059
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$5,147
Cost:
$1,050
$5,147 83,160 - - - - - - $5,147
83,160
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,617
Cost:
$1,050
- - - - $4,617 412 - - -
-
kWh
-
-
kW-months/year
$4,617
412
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,483
Cost:
$400
$2,113 34,142 $2,370 197 - - - - $2,113
34,142
kWh
$2,370
197
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$4,360
Cost:
-
- - $4,360 867 - - - - -
-
kWh
$4,360
867
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$425
Cost:
$675
$425 6,865 - - - - - - $425
6,865
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$38,115
Cost:
$9,425
$11,526 186,226 $6,730 1,064 $4,617 412 $15,242 - $11,526
186,226
kWh
$6,730
1,064
kW-months/year
$4,617
412
MMBtu
$15,242
-
$
TOTAL IMPLEMENTED Savings:
$24,085
Cost:
$400
$2,113 34,142 $6,730 1,064 - - $15,242 - $2,113
34,142
kWh
$6,730
1,064
kW-months/year
-
-
MMBtu
$15,242
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes