IAC logo
IAC Assessment: LE0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2003
Principal Product Seals
NAICS 332912 - Fluid Power Valve and Hose Fitting Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 187
Plant Area (Sq.Ft.) 100,000
Annual Production 0 Units
Production Hrs. Annual 5,460
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $198,314 2,717,800 kWh $0.07
Electricity Demand $123,151 10,237 kW-months/year $12.03
Natural Gas $19,500 1,928 MMBtu $10.11
TOTAL ENERGY COSTS $340,965
RECOMMENDED SAVINGS* $56,594 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,136
Cost:
$150
$3,061 40,658 $1,075 89 - - - - - - $3,061
40,658
kWh
$1,075
89
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$11,194
Cost:
$4,000
$7,922 105,206 $3,272 272 - - - - - - $7,922
105,206
kWh
$3,272
272
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,205
Cost:
-
$835 11,083 $370 31 - - - - - - $835
11,083
kWh
$370
31
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$175
Cost:
$98
- - - - $175 17 - - - - -
-
kWh
-
-
kW-months/year
$175
17
MMBtu
-
-
$
-
-
$
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$5,397
Cost:
-
- - - - - - $5,397 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,397
-
$
-
-
$
06: 2.8112 COMBINE UTILITY METERS Savings:
$864
Cost:
$3,000
- - - - - - $864 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$864
-
$
-
-
$
07: 2.8112 COMBINE UTILITY METERS Savings:
$3,442
Cost:
$3,000
- - - - - - $3,442 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,442
-
$
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,379
Cost:
$149
$4,106 54,534 $1,153 96 - - - - $120 - $4,106
54,534
kWh
$1,153
96
kW-months/year
-
-
MMBtu
-
-
$
$120
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$9,359
Cost:
$5,100
- - - - $9,359 909 - - - - -
-
kWh
-
-
kW-months/year
$9,359
909
MMBtu
-
-
$
-
-
$
10: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,007
Cost:
$1,050
$1,007 13,381 - - - - - - - - $1,007
13,381
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,436
Cost:
$2,500
- - $14,436 1,200 - - - - - - -
-
kWh
$14,436
1,200
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$56,594
Cost:
$19,047
$16,931 224,862 $20,306 1,688 $9,534 926 $9,703 - $120 - $16,931
224,862
kWh
$20,306
1,688
kW-months/year
$9,534
926
MMBtu
$9,703
-
$
$120
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost