IAC logo
IAC Assessment: LE0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2003
Principal Product Insulation Facings (Paper Laminate)
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales n/a
# of Employees 103
Plant Area (Sq.Ft.) 155,000
Annual Production 1,000,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $376,987 5,130,800 kWh $0.07
Electricity Demand $146,189 15,496 kW-months/year $9.43
Natural Gas $126,243 14,518 MMBtu $8.70
TOTAL ENERGY COSTS $649,419
RECOMMENDED SAVINGS* $215,254 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,966
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$210,423
Cost:
$300,000
$168,780 2,296,320 $41,643 4,416 - - $168,780
2,296,320
kWh
$41,643
4,416
kW-months/year
-
-
MMBtu
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$2,647
Cost:
$7,000
$2,647 36,016 - - - - $2,647
36,016
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$952
Cost:
-
$952 12,948 - - - - $952
12,948
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$367
Cost:
-
$367 4,992 - - - - $367
4,992
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$440
Cost:
$560
- - - - $440 51 -
-
kWh
-
-
kW-months/year
$440
51
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$425
Cost:
$825
$425 5,781 - - - - $425
5,781
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$215,254
Cost:
$308,385
$173,171 2,356,057 $41,643 4,416 $440 51 $173,171
2,356,057
kWh
$41,643
4,416
kW-months/year
$440
51
MMBtu
TOTAL IMPLEMENTED Savings:
$3,966
Cost:
$7,000
$3,966 53,956 - - - - $3,966
53,956
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas