Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2003
Principal Product Steel Wire Rope and Strand
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 479
Plant Area (Sq.Ft.) 600,000
Annual Production 24,000 Tons
Production Hrs. Annual 8,568
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $980,742 20,517,700 kWh $0.05
Electricity Demand $273,211 48,034 kW-months/year $5.69
Natural Gas $900,672 154,953 MMBtu $5.81
TOTAL ENERGY COSTS $2,154,625
RECOMMENDED SAVINGS* $103,716 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$37,011
Cost:
-
- - $37,011 6,516 - - - - -
-
kWh
$37,011
6,516
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$32,033
Cost:
-
$27,461 574,508 $4,572 805 - - - - $27,461
574,508
kWh
$4,572
805
kW-months/year
-
-
MMBtu
-
-
$
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$14,409
Cost:
-
- - - - - - $14,409 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,409
-
$
04: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$10,900
Cost:
-
- - - - - - $10,900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,900
-
$
05: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$6,047
Cost:
$10,000
- - - - $6,047 1,041 - - -
-
kWh
-
-
kW-months/year
$6,047
1,041
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,247
Cost:
$750
- - - - $2,247 387 - - -
-
kWh
-
-
kW-months/year
$2,247
387
MMBtu
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,069
Cost:
-
$1,069 22,362 - 534 - - - - $1,069
22,362
kWh
-
534
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$103,716
Cost:
$10,750
$28,530 596,870 $41,583 7,855 $8,294 1,428 $25,309 - $28,530
596,870
kWh
$41,583
7,855
kW-months/year
$8,294
1,428
MMBtu
$25,309
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost