IAC logo
IAC Assessment: LE0202
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0202
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2004
Principal Product Upholestered Furniture
NAICS 337121 - Upholstered Household Furniture Manufacturing
SIC 2512 - Upholstered Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 176
Plant Area (Sq.Ft.) 160,000
Annual Production 49,000 Pieces
Production Hrs. Annual 2,000
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,213 1,031,040 kWh $0.06
Electricity Demand $27,524 3,966 kW-months/year $6.94
Natural Gas $80,639 7,588 MMBtu $10.63
TOTAL ENERGY COSTS $173,376
RECOMMENDED SAVINGS* $30,534 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,294
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$24,240
Cost:
$29,000
- - - - $24,240 2,289 -
-
kWh
-
-
kW-months/year
$24,240
2,289
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,420
Cost:
$13,640
- - - - $3,420 323 -
-
kWh
-
-
kW-months/year
$3,420
323
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,378
Cost:
$2,500
- - $1,378 197 - - -
-
kWh
$1,378
197
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$879
Cost:
-
$580 9,211 $299 43 - - $580
9,211
kWh
$299
43
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$397
Cost:
$500
$244 3,880 $153 22 - - $244
3,880
kWh
$153
22
kW-months/year
-
-
MMBtu
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$220
Cost:
-
$220 3,497 - - - - $220
3,497
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,534
Cost:
$45,640
$1,044 16,588 $1,830 262 $27,660 2,612 $1,044
16,588
kWh
$1,830
262
kW-months/year
$27,660
2,612
MMBtu
TOTAL IMPLEMENTED Savings:
$6,294
Cost:
$16,640
$1,044 16,588 $1,830 262 $3,420 323 $1,044
16,588
kWh
$1,830
262
kW-months/year
$3,420
323
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas